Ops/Comm Scheduling meeting

Location : CR22 in R1 @ 15:30 pm on Tuesday 7th

Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402

Actions from last meeting
  • Generate appropriate table to store absorber pressure and material information (Janusz) : Janusz coming on Wed. Stands
  • DS readback current requires calibration (DL) : Asked Daresbury when they can schedule it. Stands
  • John G to think about a shielding solution for the Hall probe connectors
  • SSH lockout procedure documentation (Paolo) and details of implementation (Steve)
  • Go over FC and DS alarm handler spreadsheets (Pierrick,Mark,John C)
  • Keep on top of SS documentation (Josef,All)
  • Install FC monitoring in ISIS MCR (Pierrick,Paolo)
  • Implement a search function for the CDB (Someone)

*DC report
*Work plan for the next week: 2016-06-20-Workplan.pdf

Ongoing work

  • SS QD/QP commissioning
  • Electrical work (DS Calibration)
  • Water system work
  • FC cooldown and testing
  • Planning for July running
    • Reminder
      • Hall locked on afternoon of Friday 24th
      • Monday 27th - Startup with pulsers
      • Tuesday 28th - Startup with beam ; 11 am beam tune with ISIS
    • Shifts and shift takeup
    • Training plan : http://micewww.pp.rl.ac.uk/projects/operations/wiki/TrainingPlan201602
      • New elements
        • Whatever is needed for the SS and FC
        • Alarm Handler
    • CDB : do we have all necessary information in the CDB
      • Get Target Depth, Target Delay, Total Beam Loss to read out (currently 0 or blank)
      • Solenoid currents
      • Solenoid polarity
      • Focus coil current
      • Focus coil polarity
      • Absorber material
      • Absorber pressure (if necessary)
      • Tracker gas and pressure
    • Progress on SS procedure documentation
    • What happens when <something> happens? Document
    • Formal freeze of online software : Monday 27th
  • AOB
  • DONM : 21/6/2016