Ops/Comm Scheduling meeting¶
Location : CR5 in R18 @ 15:30 pm on Tuesday 17th
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
Agenda¶
- Actions from last meeting
- Generate appropriate table to store absorber pressure and material information (Janusz) : (almost done)
- DS readback current requires calibration (DL) : stands until close to powerup
- Henry, Craig, Paul and Pierrick to look into the water detectors in the trench : Still being worked on. Stands
- Check ISIS spreadsheet (Steve)
- I asked Bryan about getting an up-to-date ISIS schedule. He said that the "provisional" one from July 15 is the last official one he had but he will ask around if there is a more up-to-date one. Haven't heard back yet.
- DC report
- Work plan for the next week
- QP/QD work : http://micewww.pp.rl.ac.uk/attachments/6181/MICE_Electrical_Work_List_25APR16.docx
- Water system work
- FC cooldown
- Bellows re-installation
- Target fibre work
- Planning for July running
- Run planning - there will be a discussion on Thursday to start the run planning
- Update to work on alarm handler and spreadsheets
- School visit on May 23rd
- AOB
- DONM : 24/3/2016 IN CR11 in R3