20160503 » History » Revision 4
Revision 3 (Boyd, Steven, 02 May 2016 11:48) → Revision 4/17 (Karadzhov, Yordan, 03 May 2016 14:15)
h1. Ops/Comm Scheduling meeting Location : CR11 in R3 @ 15:30 pm on Tuesday 3rd Phone access : ReadyTalk number US 866-740-1260 UK 0800-496-0576 Swiss 0800-70-53-51 Italy 800182592 Access Code: 2155402 h1. Agenda * *Actions from last meeting* ** Generate appropriate table to store absorber pressure and material information (Janusz) : (almost done) ** DS readback current requires calibration (DL) : stands until close to powerup ** Ensure cooling channel magnet readback is accurate. Follow Rogers MICE note 474 procedure. - Action Jaroslaw : *** Chris talked with M. Courthold about current tolerances. Read note 474. Stands ** Issues arising from last data taking run need to be identified and actioned (Boyd) : Stands ** Move the tracker CAENbus module higher up the chain (Craig) ** Get an estimate for how long it takes to wire in the chiller in (Andy) * DC report * Work plan for the next week : http://micewww.pp.rl.ac.uk/attachments/5892/Mice_Hall_Plan-16-03-16.xlsx * QP/QD work * Water system work plan * Bellows installation and FC cooldown * Safety around the PRY - procedure for working on top of the PRY * Tracker hall probe installation * AOB ** Prescaled trigger discussion (Online group). If you are interested, please indicate your availability in the doodle: http://doodle.com/poll/wnkk4aevq938keb8yinf8gkm/admin#table * DONM : 10/3/2016