h1. Ops/Comm Scheduling meeting 

 Location : CR11 in R3 @ 15:30 pm on Tuesday 3rd 

 Phone access :    ReadyTalk number  
 US 866-740-1260 
 UK 0800-496-0576 
 Swiss 0800-70-53-51 
 Italy 800182592 
 Access Code: 2155402 

 h1. Agenda 

 * *Actions from last meeting* 
 ** Generate appropriate table to store absorber pressure and material information    (Janusz) : (almost done) 
 ** DS readback current requires calibration (DL) : stands until close to powerup 
 ** Ensure cooling channel magnet readback is accurate. Follow Rogers MICE note 474 procedure. - Action Jaroslaw :  
 *** Chris talked with M. Courthold about current tolerances. Read note 474. Stands 
 ** Issues arising from last data taking run need to be identified and actioned (Boyd) : Stands 
 ** Move the tracker CAENbus module higher up the chain (Craig) 
 ** Get an estimate for how long it takes to wire in the chiller in (Andy) 

 * DC report 
 * Work plan for the next week : http://micewww.pp.rl.ac.uk/attachments/5892/Mice_Hall_Plan-16-03-16.xlsx 
 * QP/QD work 
 * Water system work plan 
 * Bellows installation and FC cooldown 
 * Safety around the PRY - procedure for working on top of the PRY 
 * Tracker hall probe installation 
 * AOB 


 * DONM : 10/3/2016