h1. Ops/Comm Scheduling meeting
2
3
Location : CR11 in R3 @ 15:30 pm on Tuesday 3rd
4
5
Phone access :  ReadyTalk number 
6
US 866-740-1260
7
UK 0800-496-0576
8
Swiss 0800-70-53-51
9
Italy 800182592
10
Access Code: 2155402
11
12
h1. Agenda
13
14
* *Actions from last meeting*
15
** Generate appropriate table to store absorber pressure and material information  (Janusz) : (almost done)
16
** DS readback current requires calibration (DL) : stands until close to powerup
17
** Ensure cooling channel magnet readback is accurate. Follow Rogers MICE note 474 procedure. - Action Jaroslaw : 
18
*** Chris talked with M. Courthold about current tolerances. Read note 474. Stands
19
** Issues arising from last data taking run need to be identified and actioned (Boyd) : Stands
20
** Move the tracker CAENbus module higher up the chain (Craig)
21
** Get an estimate for how long it takes to wire in the chiller in (Andy)
22
23
* DC report
24
* Work plan for the next week : http://micewww.pp.rl.ac.uk/attachments/5892/Mice_Hall_Plan-16-03-16.xlsx
25
* QP/QD work
26
* Water system work plan
27
* Bellows installation and FC cooldown
28 3 Boyd, Steven
* Safety around the PRY - procedure for working on top of the PRY
29 1 Boyd, Steven
* Tracker hall probe installation
30
* AOB
31
32
33
* DONM : 10/3/2016