Actions
20160503 » History » Revision 1
Revision 1/17
| Next »
Boyd, Steven, 02 May 2016 11:47
Ops/Comm Scheduling meeting¶
Location : CR11 in R3 @ 15:30 pm on Tuesday 3rd
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
Agenda¶
- Actions from last meeting
- Generate appropriate table to store absorber pressure and material information (Janusz) : (almost done)
- DS readback current requires calibration (DL) : stands until close to powerup
- Ensure cooling channel magnet readback is accurate. Follow Rogers MICE note 474 procedure. - Action Jaroslaw :
- Chris talked with M. Courthold about current tolerances. Read note 474. Stands
- Issues arising from last data taking run need to be identified and actioned (Boyd) : Stands
- Move the tracker CAENbus module higher up the chain (Craig)
- Get an estimate for how long it takes to wire in the chiller in (Andy)
- DC report
- Work plan for the next week : http://micewww.pp.rl.ac.uk/attachments/5892/Mice_Hall_Plan-16-03-16.xlsx
- QP/QD work
- Water system work plan
- Bellows installation and FC cooldown
- Safety around the PRY
- Working in confined spaces (draft) : attachment:MICE-002.doc
- Tracker hall probe installation
- AOB
- DONM : 10/3/2016
Updated by Boyd, Steven about 7 years ago · 1 revisions