Actions
Ops/Comm Scheduling meeting¶
Location : CR11 in R3 @ 15:30 pm on Tuesday 12th
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
Agenda¶
- Actions from last meeting
- Generate appropriate table to store absorber pressure and material information (Janusz) : Stands
- DS readback current requires calibration (DL) : stands until close to powerup
- Ensure cooling channel magnet readback is accurate. Follow Rogers MICE note 474 procedure. - Action Jaroslaw :
- Chris talked with M. Courthold about current tolerances. Read note 474. Stands
- Issues arising from last data taking run need to be identified and actioned (Boyd) : Stands
- Move the tracker CAENbus module higher up the chain (Craig)
- Ask Vicky Bayliss about the DS compressor which apparently has degraded since a recent service. (Done)
- Get an estimate for how long it takes to wire in the chiller in (Andy)
- Colin and John will come up with a plan for the water system work. (Colin/John)
- Colin/Andy will have a discussion about the best way to mitigate the safety problem around the lack of the PRY deck.
- Andy G will look at Steve Griffith's Electrical workplan and update the DC on where we are.
- DC report
- Work plan for the next week : http://micewww.pp.rl.ac.uk/attachments/5892/Mice_Hall_Plan-16-03-16.xlsx
- QP/QD work
- Water system work plan
- Bellows installation and FC cooldown
- Plans for ISIS roof work
- Safety around the PRY
- Working in confined spaces (draft) : MICE-002.doc
- AOB
- DONM : 26/4/2016
Updated by Boyd, Steven about 7 years ago ยท 3 revisions