Ops/Comm Scheduling meeting

Location : CR011 R3 @ 15:30 pm

Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402

Agenda

  • Review of tasks and activities identified at last meeting
  • Action Item : Pierrick/Mark - ensure that the pressure and material in the absorber volumes are recorded
    • A pull-down list on run control will let the shifters define the absorber to be used in each run pressure sensors are available and will be read out into CDB. Any further developments?
  • Current and near future activities
    • DS Cooldown, DS PS return and calibration schedule
    • Tracker patch panel leak work and schedule
    • Focus coil installation and vacuum test schedule
    • Controls and Monitoring : Network reconfiguration and testing
    • Readiness for the expert led run on Wednesday
    • Daresbury work schedule
  • Operational Schedule
    • Expert led run : Wed Feb 17th. Hall to be left closed overnight
    • Beam tuning from 10 am on Feb 18th
    • Data-taking nominally begins on the 23rd with shift training on the 22nd. Shift training in the morning will involve talks
      in R1 and a hall walk-around. Hall should closed up around 13:00.
  • AOB
  • Chair of meetings for next 5 weeks
    • Steve is teaching at this time for the next 5 weeks. DC will chair the meeting.
  • DONM : 23/2/2016