1 1 Boyd, Steven
h1. Commissioning and Ops Scheduling meeting : 2/2/2016
2
3
To be held in CR10 in the ATLAS Building @ 15:30 pm 
4
5
Phone access :  ReadyTalk number 
6
US 866-740-1260
7
UK 0800-496-0576
8
Swiss 0800-70-53-51
9
Italy 800182592
10
Access Code: 2155402
11
12
h2. Agenda:
13
14
* Review of tasks and activities identified at last meeting
15
** *Action Item* : John will look at the effect of air on the MC truth scattering angle
16
** *Action Item* : Pierrick/Mark - ensure that the pressure and material in the absorber volumes are recorded 
17
*** *Action Item* : DC to work with Pierrick to ensure this
18
** *Action Item* : Steve to talk to Alan Stevens about stopping 4-hourly monitoring but leaving the alarm in place
19
** *Action Item* : Paolo, Mike and Vicky will investigate the Linde fridge PC instability issue
20
** *Action Item* : Paolo/Pierrick will think of a way to monitor the Linde fridge PC
21
** *Action Item* : Colin, Trevor, Steve, Pierrick to have a meeting to review the Daresbury work schedule in light of running time
22
and the currently known state of the SS work. Meeting to happen on morning of Thursday 28th.
23
24
* Updates and future schedule
25
** DS Cooldown schedule
26
** Realignment work and schedule
27
** Cooling water discussion
28
** Controls and Monitoring : Network reconfiguration
29
** Tracker patch panel leak work
30
** Electrical work schedule
31
** Data-taking schedule