h1. Commissioning and Ops Scheduling meeting : 26/1/2016
2
3
To be held in CR10 in the ATLAS Building @ 15:30 pm 
4
5
Phone access :  ReadyTalk number 
6
US 866-740-1260
7
UK 0800-496-0576
8
Swiss 0800-70-53-51
9
Italy 800182592
10
Access Code: 2155402
11
12
h2. Agenda:
13
14
* Review of tasks and activities identified at last meeting
15
** Realignment work
16 8 Boyd, Steven
*** *Action Item (Colin to prod John C)* : need to get John's data with fiducials in it to get to Tony Middleton. _Expected yesterday_
17 1 Boyd, Steven
** Simulation of material in the interspace
18
*** *Action Item* : John to give these files to the tracker group to make certain tracker resolution doesn't change
19
*** *Action Item* : John to do a simulation with air in the interspace and He in the absorber volume
20
*** *Action Item* : Pierrick/Mark - ensure that the pressure and material in the absorber volumes are recorded 
21
*** *Action Item* : Colin will check with Alan Bross whether the LiH absorber can withstand vacuum
22
** Cooling water discussion
23 9 Boyd, Steven
*** *Action Item* : Colin and John to talk and agree on the plan. _Discussion complete but further work needed_
24 1 Boyd, Steven
** ISIS Monitoring of SS magnets
25
*** *Action Item* : Josef/Colin to check with Alan about monitoring requirements for the SS magnets.
26
** BLOCS and SOCS
27 2 Boyd, Steven
*** *Action Item* : -Steve to remind Adam that we need SOCs.-
28 1 Boyd, Steven
** DS PS Installation
29 8 Boyd, Steven
*** *Action Item* : Colin is to get an estimate for power supply installation time. _2 sets of 2-3 days over a space of 2 weeks_
30 1 Boyd, Steven
* Upcoming and ongoing activities : chaired by DC
31
** "Operations calendar":https://www.google.com/calendar/embed?src=miceops%40gmail.com&ctz=Europe/London
32
** C&M Network reconfiguration
33 14 Boyd, Steven
** Realignment work schedule
34 13 Boyd, Steven
** Tracker patch panel leak work
35 10 Boyd, Steven
** Date of DSA closure and work required before hand
36 3 Boyd, Steven
** "Henry's January workplan":http://micewww.pp.rl.ac.uk/projects/operations/wiki/WorkPlanJanuary2016
37 1 Boyd, Steven
** "Daresbury workplan":http://micewww.pp.rl.ac.uk/attachments/5602/MICE_Work_List_18-01-16_v2_1.pdf
38
* AOB
39
* Date of next meeting : February 2nd
40
41
42
h2. Minutes
43 15 Boyd, Steven
44
Present: Andy, Vicky Bayliss, Paolo, Durga, Chris R, Steve B, Paul K, Trevor H, Jaroslaw, Mike C, Victoria, John N, Paul H,  Henry N, Ken L
45
46
h3. Review of action items
47
48
* Realignment work
49
** *Action Item (Colin to prod John C)* : need to get John's data with fiducials in it to get to Tony Middleton. _Expected yesterday_
50 18 Boyd, Steven
*** _Done_
51 15 Boyd, Steven
* Simulation of material in the interspace
52
** *Action Item* : John to do a simulation with air in the interspace and He in the absorber volume
53 18 Boyd, Steven
*** _John presented plots to show that there is little effect. However, these plots include systematic effects in the reconstruction
54
that are being worked on._
55
*** _*Action Item* : John will look at the effect of air on the MC truth scattering angle_
56 15 Boyd, Steven
** *Action Item* : Pierrick/Mark - ensure that the pressure and material in the absorber volumes are recorded 
57 18 Boyd, Steven
*** _*Action Item* : DC to work with Pierrick to ensure this_
58 15 Boyd, Steven
** *Action Item* : Colin will check with Alan Bross whether the LiH absorber can withstand vacuum
59 18 Boyd, Steven
*** _Alan says that the LiH absorber can withstand vacuum._ 
60 15 Boyd, Steven
* Cooling water discussion
61
** *Action Item* : Colin and John to talk and agree on the plan. 
62 18 Boyd, Steven
*** _Discussion complete but further work needed_
63 15 Boyd, Steven
* ISIS Monitoring of SS magnets
64
** *Action Item* : Josef/Colin to check with Alan about monitoring requirements for the SS magnets.
65 18 Boyd, Steven
*** _Josef doesn't think we need to monitor to the level we are doing now. Proposed to stop the 4-hour monitoring and just leave
66
the buzzer in the control room._
67 17 Boyd, Steven
*** *Action Item* : Steve to talk to Alan Stevens about this possibility-
68 15 Boyd, Steven
* BLOCS and SOCS
69
** *Action Item* : Steve to remind Adam that we need SOCs.
70 18 Boyd, Steven
*** _Done_
71 15 Boyd, Steven
* DS PS Installation
72
** *Action Item* : Colin is to get an estimate for power supply installation time. 
73 18 Boyd, Steven
*** _2 sets of 2-3 days over a space of 2 weeks._
74 15 Boyd, Steven
75
h3. Updates and future schedule
76
77 20 Boyd, Steven
*DS Power Supply work
78
** (Trevor) The PS is expected to return in mid-February (8th - 15th). He plans to start commissioning
79
the new PS on Feb 22nd. This could roll into the next week (which is nominally a data-taking week so may need to be postponed).
80
** (Vicky) The compressor has a leak and will be fixed on Friday 29th and cleaned on Monday 1st
81
** (Discussion between Mike, Vicky and Henry) : The Linde IOC has been beahving oddly and we need to understand it.
82
*** *Action Item* : Paolo, Mike and Vicky will investigate this issue ASAP. We can't cool down magnet until this is understood.
83
** (Discussion between Mike, Vicky and Henry) : We plan to start the cooldown of the cold box on Tuesday 2nd, with work on the controls and
84
monitoring doable whilst that is happening. If all is well, we can start the cooldown of the magnet  on Thursday 4th.
85
** (Discussion between Paolo and Mike) : we need a way of monitoring the status of the Linde IOC machine
86
** *Action Item* : Paolo/Pierrick to consider this issue
87
 
88
* Controls and Monitoring : Network reconfiguration
89
** (Paolo) Most work has been done but we wait for Pierrick to return to finish it. There is potentially another week of work with 1 - 2
90
days of severe disruption to the network whilst things are tested. This needs to be advertised well in advance
91 1 Boyd, Steven
92 20 Boyd, Steven
* Realignment work
93
** Drilling of holes in the flanges will be done by Thursday 28th
94
** Template to show where the holes should go have been designed but need to be constructed.
95
** EMR will not be moved further at this time
96
** Revisit next week
97
98
* Tracker patch panel leak work
99
** John wants to take the front of the PRY off to get at the tracker leak, which he may have a solution for. This can be done now.
100
101
* DSA Work before closure on Friday 29th
102
** Need to reconnect the dipole magnets, and test all magnets in the DSA 
103
** New drip trays will not be installed at this point
104
105
* Electrical work schedule
106
** (Trevor) Trevor/Steve Griffiths will be here on Monday 1st/Tuesday 2nd to do a low current test on the SS. This will
107
require the Hall closed up and the SS permit to be granted. DC will work with Trevor on this.
108
*** *Action Item* : (John G) need to put barriers around any open part of the SS
109
*** *Action Item* : Andy/DC will organise the magnetic sweep
110
** A long discussion on the Daresbury scheduled ensued. We decided we needed a longer discussion.
111
** *Action Item* : Colin, Trevor, Steve, Pierrick to have a meeting to review the Daresbury work schedule in light of running time
112
and the currently known state of the SS work. Meeting to happen on morning of Thursday 28th.