20160126 » History » Version 2
Boyd, Steven, 25 January 2016 09:20
1 | 1 | Boyd, Steven | h1. Commissioning and Ops Scheduling meeting : 26/1/2016 |
---|---|---|---|
2 | |||
3 | To be held in CR10 in the ATLAS Building @ 15:30 pm |
||
4 | |||
5 | Phone access : ReadyTalk number |
||
6 | US 866-740-1260 |
||
7 | UK 0800-496-0576 |
||
8 | Swiss 0800-70-53-51 |
||
9 | Italy 800182592 |
||
10 | Access Code: 2155402 |
||
11 | |||
12 | h2. Agenda: |
||
13 | |||
14 | * Review of tasks and activities identified at last meeting |
||
15 | ** Realignment work |
||
16 | *** *Action Item (Colin to prod John C)* : need to get John's data with fiducials in it to get to Tony Middleton. |
||
17 | ** Simulation of material in the interspace |
||
18 | *** *Action Item* : John to give these files to the tracker group to make certain tracker resolution doesn't change |
||
19 | *** *Action Item* : John to do a simulation with air in the interspace and He in the absorber volume |
||
20 | *** *Action Item* : Pierrick/Mark - ensure that the pressure and material in the absorber volumes are recorded |
||
21 | *** *Action Item* : Colin will check with Alan Bross whether the LiH absorber can withstand vacuum |
||
22 | ** Cooling water discussion |
||
23 | *** *Action Item* : Colin and John to talk and agree on the plan. |
||
24 | ** ISIS Monitoring of SS magnets |
||
25 | *** *Action Item* : Josef/Colin to check with Alan about monitoring requirements for the SS magnets. |
||
26 | ** BLOCS and SOCS |
||
27 | 2 | Boyd, Steven | *** *Action Item* : -Steve to remind Adam that we need SOCs.- |
28 | 1 | Boyd, Steven | ** DS PS Installation |
29 | *** *Action Item* : Colin is to get an estimate for power supply installation time. |
||
30 | * Upcoming and ongoing activities : chaired by DC |
||
31 | ** "Operations calendar":https://www.google.com/calendar/embed?src=miceops%40gmail.com&ctz=Europe/London |
||
32 | ** C&M network reconfiguration |
||
33 | * AOB |
||
34 | * Date of next meeting : February 2nd |
||
35 | |||
36 | |||
37 | h2. Minutes |