h1. Commissioning and Ops Scheduling meeting : 26/1/2016
2
3
To be held in CR10 in the ATLAS Building @ 15:30 pm 
4
5
Phone access :  ReadyTalk number 
6
US 866-740-1260
7
UK 0800-496-0576
8
Swiss 0800-70-53-51
9
Italy 800182592
10
Access Code: 2155402
11
12
h2. Agenda:
13
14
* Review of tasks and activities identified at last meeting
15
** Realignment work
16 8 Boyd, Steven
*** *Action Item (Colin to prod John C)* : need to get John's data with fiducials in it to get to Tony Middleton. _Expected yesterday_
17 11 Boyd, Steven
*** Schedule of work
18 1 Boyd, Steven
** Simulation of material in the interspace
19
*** *Action Item* : John to give these files to the tracker group to make certain tracker resolution doesn't change
20
*** *Action Item* : John to do a simulation with air in the interspace and He in the absorber volume
21
*** *Action Item* : Pierrick/Mark - ensure that the pressure and material in the absorber volumes are recorded 
22
*** *Action Item* : Colin will check with Alan Bross whether the LiH absorber can withstand vacuum
23
** Cooling water discussion
24 9 Boyd, Steven
*** *Action Item* : Colin and John to talk and agree on the plan. _Discussion complete but further work needed_
25 1 Boyd, Steven
** ISIS Monitoring of SS magnets
26
*** *Action Item* : Josef/Colin to check with Alan about monitoring requirements for the SS magnets.
27
** BLOCS and SOCS
28 2 Boyd, Steven
*** *Action Item* : -Steve to remind Adam that we need SOCs.-
29 1 Boyd, Steven
** DS PS Installation
30 8 Boyd, Steven
*** *Action Item* : Colin is to get an estimate for power supply installation time. _2 sets of 2-3 days over a space of 2 weeks_
31 1 Boyd, Steven
* Upcoming and ongoing activities : chaired by DC
32
** "Operations calendar":https://www.google.com/calendar/embed?src=miceops%40gmail.com&ctz=Europe/London
33 12 Boyd, Steven
** C&M Network reconfiguration
34 13 Boyd, Steven
** Tracker patch panel leak work
35 10 Boyd, Steven
** Date of DSA closure and work required before hand
36 3 Boyd, Steven
** "Henry's January workplan":http://micewww.pp.rl.ac.uk/projects/operations/wiki/WorkPlanJanuary2016
37 1 Boyd, Steven
** "Daresbury workplan":http://micewww.pp.rl.ac.uk/attachments/5602/MICE_Work_List_18-01-16_v2_1.pdf
38
* AOB
39
* Date of next meeting : February 2nd
40
41
42
h2. Minutes