Operations meeting : 2/10/2015

Agenda:

  • SSU Running from Oct 3 to Oct 7
  • Magnet team plans (?)

(From Yordan/Victoria)

- Pion "reference" beam every 2 hours for about 30 minutes, to check for
magnetic stability throughout the day. (Where I say "reference" because
of your comment about the DS power supply... we need to make sure that a
comment is made on that in the CDB/spreadsheet)

- 8 hours total of a (3pi, 200) beam without the diffuser for Chris
Rogers' magnetic studies
- 2 hours total of a (6pi, 200) beam without the diffuser for Chris
Rogers' magnetic studies
- 2 hours of a (3pi, 200) or (6pi, 200) beam -- whichever has the best
rate at TOF1? -- with the diffuser set at setting #6
- 2 hours of the same with the diffuser at setting #7
- 30min -- 1 hour of whichever other diffuser settings you have the time
to explore. Even 1000 spills of each would be useful, just keep the
input beam constant.

If/when they change over to solenoid mode, I would appreciate at least
one of the diffuser test runs being repeated (e.g. with setting #6 or
#7) for half an hour or so -- so a (3pi, 200) beam without the diffuser,
and a (3pi, 200) beam with diffuser setting #6. (Reason being that I
want to make sure that changing SSU from flip to solenoid mode currents
has a negligible effect on matching the beam through the diffuser)

  • Staffing constraints
    • Discussion : what sort of running can we do?

Contact details

Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402

Updated by Boyd, Steven about 8 years ago ยท 8 revisions