Actions
20150225 MOM Run Checklist Review¶
- Streamlining V3.6
- Require 2 start up lists:
- start up from free access/worker occupied state
- start up from standby state
Set System from Completely Off to Active¶
- remove item 3 (shoes, helmet, vest)
- move 10 to 5 and make BLOC job - replace
- remove 8
- remove 9
- ensure HV is on, and LM voltages on
- remove 12
- confirm neutron monitor operational
- item 16 depends on which list
- remove 17
- 18 -> confirm BL, Detector, and DAQ alarm handlers running
- 19 - ensure BL summary is operating
- 20-23 no change
- lower beamstop -> open beamstop & verify
- remove 25
- remove 26
- remove 28 (done by RC)
- 30: verify w/BLOC that target is ready and timing OK
- remove 31 and 32
- add start RC
Set System from Standby to Active¶
- MOM collects keys (lock target system enable, BS, and Muon Beam Permit)
- collect Target Frame Enable key from ISIS
- confirm BL elements are on and ready
- lower target frame
- start target
- start RC
Set System from Active to Standby¶
- replace 3 & 4 with ensure shifter has target frame raised
- remove 8
- ensure BLOC has closed BS
- remove 14
Set System from Active to Completely Off¶
- replace 3 & 4 with ensure target frame raised
- remove 8
- remove 16
Actions:¶
- PMH - add PA setting to RefRun
- PMH - verify RC ensures DAQ status ready
- PMH - modify RC to get OnMon status
- PMH - confirm w/Adam the need/desire to have an OnRec status flag
- SB - create new lists
- SB/PMH - make MOM checklist a GUI?
- Create/update BLOC checklists: BL, Target, DS
Updated by Hanlet, Pierrick over 8 years ago ยท 5 revisions