Project

General

Profile

Actions

2016-12-02-EB-CSw

Software & Computing Issues

  • Software
    • TOF:
      • improvement/bug fix in MC digitization - potentially resolves ~75 ps discrepancy between truth/reco
    • Tracker:
      • Inefficiency in TKD reconstruction shown up by analysis.
    • Global:
      • Track-matching performance is slow for multiple spacepoints/tracks
      • DR looking into processing schemes that will preserve fast MLCR reco while also incorporating global matching
    • MC:
      • G4BL generation of pion beam libraries blocked -- issues with very few pions getting through to TOF1/Tracker.
        • Need guidance from analysis -- while waiting for resource to address the pion yield, is it still valuable to go ahead and generate 'muon' libraries and push through simulations?
  • Infrastructure
    • Survey from last run has been incorporated into geometry + a few other requests for extra virtual planes.
  • Data processing
    • Automatic offline reconstruction continues with latest survey, calibrations
    • To-do: Reprocessing of earlier runs with latest patch
  • Personnel
    • DAQ head - EO to replace YK
      • Need to beef up documentation for handover
    • Local DAQ expertise
      • EO trained DR on electronics/cabling in rack room. Need further documenting.
    • Geometry head
      • RB+DR interaction to document & detail geometry procedures has commenced.

Updated by Rajaram, Durga over 6 years ago ยท 1 revisions