h2. Software & Computing Issues
4
5
* Software
6
**  There was issue with geometry missing diffuser material -- fixed
7
** Tracker-tracker misalignment seen (again) -- under investigation
8
** TOF discrepancy ~100ps between truth and reco -- under investigation
9 2 Rajaram, Durga
** Momentum discrepancy ~ few MeV between data/MC -- under investigation
10 1 Rajaram, Durga
11
* Data reprocessing & MC production
12
** Step4 data routinely reprocessed with each new MAUS release
13
** Reconstruction quality monitoring and flagging being developed
14
** MC: will need new G4BL input beam libraries once the pion beamline optics is finalized
15
*** Starting to look at changing the G4BL-MAUS interfacing to be more efficient
16
** MC speed issue remains
17
*** for now circumvented by throwing computing resources at it
18
19
* Infrastructure
20
** Improvements to make interfacing between cooling channel  DB <-> RunControl more robust
21
** DB structure & API for holding absorber information (to be set from RC) -- developed, now being tested
22
** Reconstruction quality table (see above) developed -- to be tested
23
24
* Online
25
** Prototype prescale-trigger design developed
26