Project

General

Profile

2016-06-10-SwC » History » Version 1

Rajaram, Durga, 10 June 2016 15:36

1 1 Rajaram, Durga
h1. 2016-06-10-SwC
2
3
h2. Software & Computing Issues
4
5
* Software
6
**  There was issue with geometry missing diffuser material -- fixed
7
** Tracker-tracker misalignment seen (again) -- under investigation
8
** TOF discrepancy ~100ps between truth and reco -- under investigation
9
10
* Data reprocessing & MC production
11
** Step4 data routinely reprocessed with each new MAUS release
12
** Reconstruction quality monitoring and flagging being developed
13
** MC: will need new G4BL input beam libraries once the pion beamline optics is finalized
14
*** Starting to look at changing the G4BL-MAUS interfacing to be more efficient
15
** MC speed issue remains
16
*** for now circumvented by throwing computing resources at it
17
18
* Infrastructure
19
** Improvements to make interfacing between cooling channel  DB <-> RunControl more robust
20
** DB structure & API for holding absorber information (to be set from RC) -- developed, now being tested
21
** Reconstruction quality table (see above) developed -- to be tested
22
23
* Online
24
** Prototype prescale-trigger design developed
25
*** Reconstruction software changes required to handle this