2015-09-15 physics coordinator report¶
- V Blackmore Analysis of Q123 scan data; beam distribution is very independent of Q123 currents; no improvement in rate
- V Blackmore is resurrecting old Mark Rayner beamline analysis
- Tracker field off alignment; no progress while Chris Hunt on vacation - tracker reconstruction mapping file updated to account online recon stuff
- Tracker to field alignment; algorithm is producing stable result ~5 mrad in x and y; but note that space point reconstruction is suspect (rotation); looking into systematics which are likely to be significant
- PID field off alignment; confirmed survey by propagating EMR tracks into TOF2 (incl EMR misalignment); found missing TOF0 slab (possible hardware issue) and possible incorrect survey
- Particle selection/cut-based PID; found mis-calibration of EMR (bad timing window); found bad calibration of TOF (fit to the muon peak not electron peak)
- 2015/02 plan we have outline plan and settings, need to firm up details of expected rate/etc; SSD/M1 issue now blocking
- Cooling demo paper; discussion on 11th September; some rewriting of draft needed; more details on lattice optimisation; regroup Friday 25th September; ignore SSD/M1 issue...
- SSD/M1 issue - see analysis talk