Last user cycle : 2016/02

  • After much straight track running, the SS magnets were ramped to current on October 22 (or so).
  • In the next week we gathered a lot of data (the DS really helps!)
    • LiH scattering data
    • Beam tuning
    • Runs with different diffuser settings
LiH data
Overall run time 51 hours
Task Description Momentum Triggers taken SSU (ECE) SSU M1/M2 FC SSD (ECE) SSD M1/M2 Beamline tag Cooling channel tag
2 Scattering 140 675k at TOF2 Y Y/Y Solenoid Y N/N 3-140+M3-Test2 CCramp-6.1.4-NoTrims
3 Scattering 170 537k at TOF2 Y Y/Y Solenoid Y N/N 3-170+M3-Test1 CCramp-6.1.4-NoTrims
4 Scattering 200 508k at TOF2 Y Y/Y Solenoid Y N/N 3-200+M3-Test1 CCramp-6.1.4-NoTrims
5 Scattering 240 517k at TOF2 Y Y/Y Solenoid Y N/N 3-240+M3-Test1 CCramp-6.1.4-NoTrims

Next user cycle : 2016/03 - Nov 15th - Dec 16th

  • Need to define the run plan in advance - important to schedule any SS current changes which (ideally) will always be done during a morning shift.
  • Beam begins on Nov 15th
  • Expert led run on Nov 16th
  • Shifts start on Nov 18th
  • There are 6 shift blocks in the upcoming user cycle. They are not full.
Current signup
Shift block Day shift (08:00-16:00) / 2 Back shift (16:00-00:00) / 2 Night shift (00:00-08:00) / 2 BLOC ? # shifters needed
1 Magnet shift (empty) 2 0 No 2 Data-taking during the afternoon; Issues with magnet monitoring during the night
2 Magnet shift (empty) 0 1 No 3 Data-taking not possible. Issues with magnet monitoring.
3 2 1 1 Yes 2 Can staff around the clock; but data-taking only in the morning
4 1 2 0 Yes 3 Issues with magnet monitoring during the night
5 2 2 1 Yes 1 Can operate; Magnet monitoring at night
6 1 2 2 Yes 1 Can operate

Updated by Boyd, Steven over 6 years ago ยท 9 revisions