Project

General

Profile

CAM-Rolling-Review-2017 » History » Version 7

Rajaram, Durga, 09 June 2017 02:03

1 1 Rajaram, Durga
h1. Rolling Review of Controls & Monitoring
2
3 3 Rajaram, Durga
---
4 1 Rajaram, Durga
5 6 Rajaram, Durga
h2. Scope
6 3 Rajaram, Durga
7
The purpose of the rolling review is to "Execute a detailed investigation of the controls and monitoring code and the associated communication systems that control the power system for the superconducting magnets."
8
9 1 Rajaram, Durga
* Terms of reference: attachment:01-2016-17-Rolling-CaM-review-ToR.pdf
10 2 Rajaram, Durga
11 4 Rajaram, Durga
---
12
13 6 Rajaram, Durga
h2. Personnel
14 1 Rajaram, Durga
15 3 Rajaram, Durga
The rolling review team will include:
16
K. Long (Chair)
17
D. Rajaram (Secretary, S/w ā€™nā€™ C coordinator)
18
C. Whyte (Project Manager)
19
B. Martlew (DL Controls Group Leader)
20
P. Hodgson (Duty Coordinator, experimenter with experience in real-time systems)
21
Other persons may be coopted as necessary.
22
23
Key MICE personnel that will be required to provide material for the rolling review:
24
P. Hanlet (Controls and monitors coordinator)
25
P. Owens (DL Controls Engineer)
26
A. Oates (DL Controls Engineer)
27
P. Franchini (Online computing infrastructure coordinator)
28
A. Kurup (Controls and monitoring group member)
29
M. Courthold (Magnet and controls expert) 
30
S. Griffiths (DL Electrical Engineering Group Leader)
31
T. Hartnett (DL Electrical Engineering Group)
32
S. Feher (FNAL, Magnet expert)
33
A. Bross (Deputy Spokesman and magnet expert)
34
35
Where appropriate, advice and input from other key people, e.g. R. Pilipenko (FNAL) will be sought.
36 1 Rajaram, Durga
37 4 Rajaram, Durga
---
38 1 Rajaram, Durga
39 6 Rajaram, Durga
h2. Meetings
40 1 Rajaram, Durga
41 3 Rajaram, Durga
**** [[MEMO-CAM-Review-2016-12-19|Meeting 1]]
42 1 Rajaram, Durga
43 3 Rajaram, Durga
**** [[MEMO-CAM-Review-2017-01-12|Meeting 2]]
44 1 Rajaram, Durga
45 3 Rajaram, Durga
**** [[MEMO-CAM-Review-2017-01-26|Meeting 3]]
46 1 Rajaram, Durga
47 3 Rajaram, Durga
**** [[MEMO-CAM-Review-2017-02-24|Meeting 4]]
48 1 Rajaram, Durga
49 3 Rajaram, Durga
---
50 1 Rajaram, Durga
51 6 Rajaram, Durga
h2. Closeout documentation
52 5 Rajaram, Durga
53 7 Rajaram, Durga
*** *Summary*
54
**** attachment:2017-06-03-CAM-review-summary-final.pdf
55
*** *Document studies and status of serial communications*
56
****  attachment:CAM-Closeout-SerialCommunications.pdf
57
*** *Document final reduced command set for magnet PSU controls:
58
**** attachment:CAM-Closeout-ControlPVs-list.pdf
59
*** Zero set_current on open/close of contactors
60
**** Implemented in the IOC and IOC has been restarted since.
61 5 Rajaram, Durga
*** Magnets PSU hardware limit implementation: