1 | 1 | Rajaram, Durga | h1. Rolling Review of Controls & Monitoring |
---|---|---|---|
2 | |||
3 | 3 | Rajaram, Durga | --- |
4 | 1 | Rajaram, Durga | |
5 | 6 | Rajaram, Durga | h2. Scope |
6 | 3 | Rajaram, Durga | |
7 | The purpose of the rolling review is to "Execute a detailed investigation of the controls and monitoring code and the associated communication systems that control the power system for the superconducting magnets." |
||
8 | |||
9 | 1 | Rajaram, Durga | * Terms of reference: attachment:01-2016-17-Rolling-CaM-review-ToR.pdf |
10 | 2 | Rajaram, Durga | |
11 | 4 | Rajaram, Durga | --- |
12 | |||
13 | 6 | Rajaram, Durga | h2. Personnel |
14 | 1 | Rajaram, Durga | |
15 | 3 | Rajaram, Durga | The rolling review team will include: |
16 | K. Long (Chair) |
||
17 | D. Rajaram (Secretary, S/w ānā C coordinator) |
||
18 | C. Whyte (Project Manager) |
||
19 | B. Martlew (DL Controls Group Leader) |
||
20 | P. Hodgson (Duty Coordinator, experimenter with experience in real-time systems) |
||
21 | Other persons may be coopted as necessary. |
||
22 | |||
23 | Key MICE personnel that will be required to provide material for the rolling review: |
||
24 | P. Hanlet (Controls and monitors coordinator) |
||
25 | P. Owens (DL Controls Engineer) |
||
26 | A. Oates (DL Controls Engineer) |
||
27 | P. Franchini (Online computing infrastructure coordinator) |
||
28 | A. Kurup (Controls and monitoring group member) |
||
29 | M. Courthold (Magnet and controls expert) |
||
30 | S. Griffiths (DL Electrical Engineering Group Leader) |
||
31 | T. Hartnett (DL Electrical Engineering Group) |
||
32 | S. Feher (FNAL, Magnet expert) |
||
33 | A. Bross (Deputy Spokesman and magnet expert) |
||
34 | |||
35 | Where appropriate, advice and input from other key people, e.g. R. Pilipenko (FNAL) will be sought. |
||
36 | 1 | Rajaram, Durga | |
37 | 4 | Rajaram, Durga | --- |
38 | 1 | Rajaram, Durga | |
39 | 6 | Rajaram, Durga | h2. Meetings |
40 | 1 | Rajaram, Durga | |
41 | 3 | Rajaram, Durga | **** [[MEMO-CAM-Review-2016-12-19|Meeting 1]] |
42 | 1 | Rajaram, Durga | |
43 | 3 | Rajaram, Durga | **** [[MEMO-CAM-Review-2017-01-12|Meeting 2]] |
44 | 1 | Rajaram, Durga | |
45 | 3 | Rajaram, Durga | **** [[MEMO-CAM-Review-2017-01-26|Meeting 3]] |
46 | 1 | Rajaram, Durga | |
47 | 3 | Rajaram, Durga | **** [[MEMO-CAM-Review-2017-02-24|Meeting 4]] |
48 | 1 | Rajaram, Durga | |
49 | 3 | Rajaram, Durga | --- |
50 | 1 | Rajaram, Durga | |
51 | 6 | Rajaram, Durga | h2. Closeout documentation |
52 | 5 | Rajaram, Durga | |
53 | 7 | Rajaram, Durga | *** *Summary* |
54 | **** attachment:2017-06-03-CAM-review-summary-final.pdf |
||
55 | *** *Document studies and status of serial communications* |
||
56 | **** attachment:CAM-Closeout-SerialCommunications.pdf |
||
57 | *** *Document final reduced command set for magnet PSU controls: |
||
58 | **** attachment:CAM-Closeout-ControlPVs-list.pdf |
||
59 | *** Zero set_current on open/close of contactors |
||
60 | **** Implemented in the IOC and IOC has been restarted since. |
||
61 | 5 | Rajaram, Durga | *** Magnets PSU hardware limit implementation: |