Project

General

Profile

Actions

2018-09-18-MEMOMIPO

Joint MICE Experiment Management Office and MICE International Project Office

18th September 2018; 15:30 BST

Phone details

Agenda

  1. Introduction: KL
  2. Notes of previous meeting and status of actions: All
    • KL: will migrate EB and CB mailing lists to jiscmail
    • CR: will migrate analysis mailing list to jiscmail
    • DR: will migrate software mailing list to jiscmail
  3. Project Manager's report: CW
  4. Software and computing status: DR
  5. Paper status and plans: CR
  6. CM52: status of planning etc.: KL/All
  7. AOB

Notes

Present: ABr, KL, CR, PF

  1. Introduction: KL
    • Catch-up
  2. Notes of previous meeting and status of actions: All
    • KL: will migrate EB and CB mailing lists to jiscmail
      • Stands
    • CR: will migrate analysis mailing list to jiscmail
      • Stands.
    • PF: will migrate software mailing list to jiscmail
      • Stands.
  3. Project Manager's report: CW
    • Shipment of Italian equipment has been delayed, at owners request.
    • US equipment shipped OK, request to get invoiced as soon as possible.
    • DSA information: beam stop being removed and DSA being closed off with passive material.
  4. Software and computing status: PF
    • Hybrid MC: action stands.
    • Lack of manpower: stands -- need now to discuss how to distribute tasks being carried out by PF.
    • SSU and SSD survey: has been made into a MICE Note (thanks CR)
      • In relation to the diffuser issues, 7469 geometry update is in progress. Paper on this data needs to be finalised.
    • Track model (Tom) is doing noise study.
  5. Paper status and plans: CR
    • Emittance paper: PF is preparing new Monte Carlo. Then push to get the paper out.
    • Emittance evolution paper: Referees meeting in first week of October
    • Scattering paper: Ggo grid cluster has had some issue. Progress will be reported at CM52.
    • System performance paper: plots from most people now. Should be a paper by the CM.
    • LH2 accepted.
    • H/w paper to be restarted.
    • Over-arching magnet paper; could be considered.
  6. CM52: status of planning etc.: KL/All
    • Status of planning summarised.
  7. AOB
    • DR re-recruitment is ongoing.

Summary of actions:

  • KL: will migrate EB and CB mailing lists to jiscmail
  • CR: will migrate analysis mailing list to jiscmail
  • PF: will migrate software mailing list to jiscmail

Summary of actions:

Back to MEMO:

Back

Back to MIPO:

Back

Documents

Updated by Long, Kenneth about 5 years ago · 2 revisions