2018-07-10-CSw-MEMO » History » Version 5

Rajaram, Durga, 10 July 2018 15:44

1 1 Rajaram, Durga
h1. 2018-07-10-CSw-MEMO
2
3
Tasks:
4
5
* Geometry
6
** geometry fixes if any (DR —> PF)
7
** integrate survey information (DR —> PF)
8
** upload geometry to CDB (DR —> PF)
9
** book-keeping (DR —> PF)
10
** Status:
11
*** diffuser, tracker glue fixes done for a few geometries, needs to be done for others. DR & PF to walk through
12
*** Tracker glue issue might require another iteration 
13
14
* Data processing
15
**  currently on the GRID (DM)
16
** however, emergency & special requests on MLCR  (DR)
17
** generate list of runs, hand off to DM (DR —> PF)
18
** build MAUS for GRID (DR —> PF)
19
** push MAUS to CVMFS (JM)
20 5 Rajaram, Durga
** run on GRID (DM)
21 1 Rajaram, Durga
** reco-mover to copy output to tape & make www-visible (JM)
22
** Status:
23
*** reco-mover migrated to PPD network, JM needs to run tests
24 5 Rajaram, Durga
*** MAUS build currently on MLCR needs to be migrated to PPD network (PF)
25 1 Rajaram, Durga
26
* MC
27
** generate g4bl decks for beam generation (DR —> PF)
28
** MC requests, datacard specifications (DR —> PF, DM)
29
** run MC on GRID (DM)
30
** Status:
31
***  v5 beam generation done with tuned currents from CR
32
*** might require another iteration due to presence of GVA1 counter beamline deck
33
*** GEANT4 simulation against generated decks starting 
34
35
* TOF
36
** generate calibrations (VP —> ??)
37
** code maintenance, fixes (DR —> ??)
38
** Status:
39
*** VP has generated calibrations going back to 2016
40
*** esting against sample runs & verifying
41
42
* Tracker
43 4 Rajaram, Durga
** Status
44 1 Rajaram, Durga
***  FD pointed out an issue with tracker glue handling. There is a MAUS data card which controls the station density & feeds into the Kalman model.  Needs to be tuned for data-MC matching. FD has an ad-hoc tune for a few data-sets
45
*** Track fit with TOF seeding — not in production yet. Should be tested, especially with a diffuser-in settings
46
47
* MAUS
48
** Status:
49
*** Cuts data structure should be integrated into production
50
*** Handling of beam-by-beam datacards needs thought
51 2 Rajaram, Durga
*** MAUS Paper -- DR to push out this week
52 1 Rajaram, Durga
53
* CDB
54 5 Rajaram, Durga
** Server migrated away from MLCR
55
** upload calibrations, channel maps, geometries to CDB — includes TOF, Tracker (DR —> PF)
56
** MC production book-keeping (DM)
57
** Status
58
*** DR to collect scripts & document
59 1 Rajaram, Durga
60
* WWW
61
** Maintenance & updates (DR —> YT?)
62 5 Rajaram, Durga
63
** Computing infrastructure
64
*** CDB and reco-mover services migrated to PPD
65
*** Onrec, offrec machines remain in MLCR for special production usage
66 3 Rajaram, Durga
67 2 Rajaram, Durga
* Documentation
68
*** DR to document & put scripts on repository