2018-05-14-CSw » History » Version 4
Rajaram, Durga, 15 May 2018 16:05
1 | 1 | Rajaram, Durga | h1. Computing and Software status, May 15, 2018 |
---|---|---|---|
2 | |||
3 | |||
4 | * Software: |
||
5 | 4 | Rajaram, Durga | |
6 | 1 | Rajaram, Durga | ** TOF: |
7 | *** one PMT channel with hole in the ADC distribution -- needs to be blacklisted & accounted for in the reconstruction |
||
8 | 3 | Rajaram, Durga | *** Calibrations need to be improved & finalized to try improve efficiency especially for TOF2 |
9 | **** VP having some issues, DR to interface with him |
||
10 | 1 | Rajaram, Durga | *** TOF review has been on hiatus, to resume |
11 | |||
12 | ** Tracker: |
||
13 | *** Geometry description issue |
||
14 | *** Some evidence (?) that the tracker is misaligned for the scattering run period |
||
15 | |||
16 | ** EMR |
||
17 | *** bug fix: chi2 calculation |
||
18 | *** bug fix: polystyrene material definition |
||
19 | |||
20 | ** Geometry: |
||
21 | *** LH2 window material is incorrect in production geometries -- fix in hand |
||
22 | *** Tracker glue not correctly defined in tracker geometry -- CR has tuned the density |
||
23 | *** DR to push fixes to all Step IV production geometries |
||
24 | *** Standing: description of diffuser aperture & support materials |
||
25 | |||
26 | ** MC |
||
27 | *** bug fix: we were not seeing delta electrons due to a bug -- fixed in MAUS trunk |
||
28 | *** bug fix: tracker channel/calibration look up was incorrect in MC digitizer -- fixed in trunk |
||
29 | |||
30 | * Processing: |
||
31 | ** Plan: |
||
32 | *** make a new release |
||
33 | *** push corrected geometries |
||
34 | *** run MC production |
||
35 | *** reprocess data |
||
36 | |||
37 | * Computing: |
||
38 | ** MLCR decomissioning (PF) |
||
39 | *** Equipment & services to be migrated |
||
40 | **** Target: basically done (tested and training to be finalized) |
||
41 | **** CDB: failover next week. One more week for the PPD slave in order to be independent from the MLCR. |
||
42 | **** Backups on GRID: tarballs ready for the Archivist to be moved |
||
43 | **** Switch off: D1 survey next week before turning most of the machines off and final Archiver tarball. PF waiting for survey before turning off IOCs and machines. |
||
44 | *** Computing equipment to be returned |
||
45 | **** QPS computer |
||
46 | **** Geneva computers -- onrec machines being used for local processing, so we'd like to hold on to them as long as possible |
||
47 | |||
48 | 2 | Rajaram, Durga | * Staffing |
49 | ** HN's grid roles: agreed that PK + student/Brunel person will take over from Henry |
||
50 | ** DM says he will be able to continue supporting GRID productions/processing & if support needed he can lean on Mihailo |
||
51 | |||