Project

General

Profile

2018-05-14-CSw » History » Version 4

Rajaram, Durga, 15 May 2018 16:05

1 1 Rajaram, Durga
h1. Computing and Software status, May 15, 2018
2
3
4
* Software:
5 4 Rajaram, Durga
6 1 Rajaram, Durga
** TOF:
7
*** one PMT channel with hole in the ADC distribution -- needs to be blacklisted & accounted for in the reconstruction
8 3 Rajaram, Durga
*** Calibrations need to be improved & finalized to try improve efficiency especially for TOF2
9
**** VP having some issues, DR to interface with him
10 1 Rajaram, Durga
*** TOF review has been on hiatus, to resume
11
12
** Tracker:
13
*** Geometry description issue
14
*** Some evidence (?) that the tracker is misaligned for the scattering run period
15
16
** EMR
17
*** bug fix: chi2 calculation
18
*** bug fix: polystyrene material definition
19
20
** Geometry:
21
*** LH2 window material is incorrect in production geometries -- fix in hand
22
*** Tracker glue not correctly defined in tracker geometry -- CR has tuned the density
23
*** DR to push fixes to all Step IV production geometries
24
*** Standing: description of diffuser aperture & support materials
25
26
** MC
27
*** bug fix: we were not seeing delta electrons due to a bug -- fixed in MAUS trunk
28
*** bug fix: tracker channel/calibration look up was incorrect in MC digitizer -- fixed in trunk
29
30
* Processing:
31
**  Plan: 
32
*** make a new release
33
*** push corrected geometries
34
*** run MC production
35
*** reprocess data
36
37
* Computing:
38
** MLCR decomissioning (PF)
39
*** Equipment & services to be migrated
40
**** Target: basically done (tested and training to be finalized)
41
**** CDB: failover next week. One more week for the PPD slave in order to be independent from the MLCR.
42
**** Backups on GRID: tarballs ready for the Archivist to be moved
43
**** Switch off: D1 survey next week before turning most of the machines off and final Archiver tarball. PF waiting for survey before turning off IOCs and machines.
44
*** Computing equipment to be returned
45
**** QPS computer
46
**** Geneva computers -- onrec machines being used for local processing, so we'd like to hold on to them as long as possible
47
48 2 Rajaram, Durga
* Staffing
49
** HN's grid roles: agreed that PK + student/Brunel person will take over from Henry
50
** DM says he will be able to continue supporting GRID productions/processing & if support needed he can lean on Mihailo
51
52 1 Rajaram, Durga
* MAUS Paper:
53
** (Finally) revised draft sent to KL, PF