2018-05-14-CSw » History » Revision 3
Revision 2 (Rajaram, Durga, 15 May 2018 15:24) → Revision 3/4 (Rajaram, Durga, 15 May 2018 15:24)
h1. Computing and Software status, May 15, 2018 * Software: ** TOF: *** one PMT channel with hole in the ADC distribution -- needs to be blacklisted & accounted for in the reconstruction *** Calibrations need to be improved & finalized to try improve efficiency especially for TOF2 **** VP having some issues, DR to interface with him *** TOF review has been on hiatus, to resume ** Tracker: *** Geometry description issue *** Some evidence (?) that the tracker is misaligned for the scattering run period ** EMR *** bug fix: chi2 calculation *** bug fix: polystyrene material definition ** Geometry: *** LH2 window material is incorrect in production geometries -- fix in hand *** Tracker glue not correctly defined in tracker geometry -- CR has tuned the density *** DR to push fixes to all Step IV production geometries *** Standing: description of diffuser aperture & support materials ** MC *** bug fix: we were not seeing delta electrons due to a bug -- fixed in MAUS trunk *** bug fix: tracker channel/calibration look up was incorrect in MC digitizer -- fixed in trunk * Processing: ** Plan: *** make a new release *** push corrected geometries *** run MC production *** reprocess data * Computing: ** MLCR decomissioning (PF) *** Equipment & services to be migrated **** Target: basically done (tested and training to be finalized) **** CDB: failover next week. One more week for the PPD slave in order to be independent from the MLCR. **** Backups on GRID: tarballs ready for the Archivist to be moved **** Switch off: D1 survey next week before turning most of the machines off and final Archiver tarball. PF waiting for survey before turning off IOCs and machines. *** Computing equipment to be returned **** QPS computer **** Geneva computers -- onrec machines being used for local processing, so we'd like to hold on to them as long as possible * Staffing ** HN's grid roles: agreed that PK + student/Brunel person will take over from Henry ** DM says he will be able to continue supporting GRID productions/processing & if support needed he can lean on Mihailo * MAUS Paper: ** (Finally) revised draft sent to KL, PF