h1. Computing and Software status, May 15, 2018
2
3
4
* Software:
5
** TOF:
6
*** one PMT channel with hole in the ADC distribution -- needs to be blacklisted & accounted for in the reconstruction
7
*** Calibrations need to be finalized to try improve efficiency especially for TOF2
8
*** TOF review has been on hiatus, to resume
9
10
** Tracker:
11
*** Geometry description issue
12
*** Some evidence (?) that the tracker is misaligned for the scattering run period
13
14
** EMR
15
*** bug fix: chi2 calculation
16
*** bug fix: polystyrene material definition
17
18
** Geometry:
19
*** LH2 window material is incorrect in production geometries -- fix in hand
20
*** Tracker glue not correctly defined in tracker geometry -- CR has tuned the density
21
*** DR to push fixes to all Step IV production geometries
22
*** Standing: description of diffuser aperture & support materials
23
24
** MC
25
*** bug fix: we were not seeing delta electrons due to a bug -- fixed in MAUS trunk
26
*** bug fix: tracker channel/calibration look up was incorrect in MC digitizer -- fixed in trunk
27
28
* Processing:
29
**  Plan: 
30
*** make a new release
31
*** push corrected geometries
32
*** run MC production
33
*** reprocess data
34
35
* Computing:
36
** MLCR decomissioning (PF)
37
*** Equipment & services to be migrated
38
**** Target: basically done (tested and training to be finalized)
39
**** CDB: failover next week. One more week for the PPD slave in order to be independent from the MLCR.
40
**** Backups on GRID: tarballs ready for the Archivist to be moved
41
**** Switch off: D1 survey next week before turning most of the machines off and final Archiver tarball. PF waiting for survey before turning off IOCs and machines.
42
*** Computing equipment to be returned
43
**** QPS computer
44
**** Geneva computers -- onrec machines being used for local processing, so we'd like to hold on to them as long as possible
45
46 2 Rajaram, Durga
* Staffing
47
** HN's grid roles: agreed that PK + student/Brunel person will take over from Henry
48
** DM says he will be able to continue supporting GRID productions/processing & if support needed he can lean on Mihailo
49
50 1 Rajaram, Durga
* MAUS Paper:
51
** (Finally) revised draft sent to KL, PF