h1. Computing & Software status, October 17, 2017
2
3
4
* Software:
5
** Tracker:
6 3 Rajaram, Durga
**** PR default fitter changed to MINUIT in MAUS v3.0.0
7
**** Efficiency review on hiatus -- cut optimization, implementing MCS errors
8
**** Need to understand 50 MeV "peak" in pz distribution
9
**** Need new calibrations after waveguide swap
10 1 Rajaram, Durga
** Globals:
11 3 Rajaram, Durga
*** Gobal reconstruction output needs review & feedback
12
*** Need additional virtual planes for analysis
13 1 Rajaram, Durga
14
* MC
15 3 Rajaram, Durga
** TOF issues: data-MC discrepancy of ~150ps in e+ peak, TOF2 calibration improvement. Stands.
16 1 Rajaram, Durga
17
** G4BL
18
*** PF studying disagreements with data, production model -- awaiting a new version of MARS
19
20
** Geometry:
21
*** Bug in LH2 geometry description -- lh2 not filling the vessel fully
22 3 Rajaram, Durga
*** Bug found & fixed in application of alignment corrections. Not yet in production geometries
23 1 Rajaram, Durga
24
* Processing:
25 3 Rajaram, Durga
** Global output being produced in parallel with "fast" reconstruction in MLCR
26
** LH2 MC needs to be pushed on GRID
27 1 Rajaram, Durga
28
* DAQ/Online:
29
** Tracker calibration in progress. 
30 3 Rajaram, Durga
** Tracker veto timing not optimal - can be improved
31 1 Rajaram, Durga
32
* Controls:
33
** Alarm handler greatly improved, handful of false alarms during stable operation
34
35
* MAUS Paper
36 4 Rajaram, Durga
** Comments from KL to be incorporated