h1. Computing & Software status, October 17, 2017
2
3
4
* Software:
5
** Tracker:
6
**** Efficiency: 
7
** Tracker rolling review continues, several actions worked on -- cut optimization, implementing MCS errors. Next meeting end of the week
8
** Globals:
9
*** Speed mitigation: CR implemented geometry lookup table, speeds up by ~25%, seems to be significant overhead from MAUS outputter
10
*** Outputter can be sped up by avoiding data conversion; meanwhile plan is to trigger two jobs for each run in MLCR -- "fast" without globals, and a full reco with globals.
11
12
* MC
13
** TOF issues: stands. Need a follow up with SW.
14
** 7469 MC shows an offset of ~150ps in e+ between data and MC
15
16
** G4BL
17
*** PF studying disagreements with data, production model -- awaiting a new version of MARS
18
19
** Geometry:
20 2 Rajaram, Durga
*** Bug in LH2 geometry description -- lh2 not filling the vessel fully
21 1 Rajaram, Durga
*** Alignment for 2017/01 -- re-done, changes are very marginal
22
23
* Processing:
24
** Ne MC to be done
25
** GRID user framework is changing [ no more WMS ]. For MC, Ray and Dimitrije have been testing a new framework.  For real-data reconstruction, requires significant changes to keep GRID submission system alive. JM looking into it. 
26
27
* DAQ/Online:
28
** Tracker calibration in progress. 
29
** Tracker veto timing not optimal
30
31
* Controls:
32
** Alarm handler greatly improved, handful of false alarms during stable operation
33
34
* MAUS Paper
35
** Comments from KL to be incorporated.