Project

General

Profile

Actions

Computing & Software status

  • Software:
    • Tracker rolling review continues, several actions worked on -- cut optimization, errors. Next meeting in ~ week
    • Globals:
      • Speed mitigation: CR has started implementing fast geometry lookup. ~x2-x4 slower than current rate without globals
  • MC
    • TOF issues: stands. Need a follow up with SW
  • G4BL
    • PF studying disagreements with data, production model with MARS
    • New request from VB for MC with tuned dipoles +/- 1% -- done.
  • Geometry:
    • Neon geometry — requires minor modification to MAUS for geometry translation.
    • Alignment for 2017/01 has to be redone
  • Processing:
    • Several new MCs processed with 2.9.1
    • Ne MC to be done after MAUS patch
    • GRID user framework is changing [ no more WMS ]. For MC, Ray and Dimitrije have been testing a new framework. For real-data reconstruction, requires significant changes to keep GRID submission system alive. JM looking into it. One option is to use local resources after which will free up after data-taking.
  • DAQ/Online:
    • Tracker documentation from EO passed on to MU
    • Tracker dead channel mapping & calibration need to be done after leak fixes/cooldown
    • ISIS RF signal to MLCR needs to be verified
  • Controls:
    • AK has added LH2 PVs to the archiver.
    • Need to confirm that this is a complete set & whether/how we get temperatures/level into the CDB
  • MAUS Paper
    • Comments from KL to be incorporated.

Updated by Rajaram, Durga over 5 years ago · 9 revisions