Actions
2016-11-29-CSw-MEMO¶
Software & Computing Issues¶
- Software
- Tracker:
- NaN bug: bug identified, fix is not yet in MAUS
- Global:
- Track-matching performance is slow for multiple spacepoints/tracks
- Not much room for improvement from J. Greis' study
- DR looking into processing schemes that will preserve fast MLCR reco while also incorporating global matching
- MC:
- TOF bug fix: in digitization, could potentially affect ~75 ps discrepancy between truth/reco MC
- bug fix not yet propagated into mainline trunk
- G4BL generation of pion beam libraries blocked -- issues with very few pions getting through to TOF1/Tracker.
- Need guidance from analysis -- while waiting for resource to address the pion yield, is it still valuable to go ahead and generate 'muon' libraries and push through simulations?
- TOF bug fix: in digitization, could potentially affect ~75 ps discrepancy between truth/reco MC
- Tracker:
- Infrastructure
- Survey from last run has been incorporated into geometry.
- + a few other requests for extra virtual planes.
- Survey from last run has been incorporated into geometry.
- Data processing
- Automatic offline reconstruction with latest survey, calibrations
- To-do: Reprocessing of earlier runs with latest patch **
- Personnel
- DAQ head
- Local DAQ expertise
- EO & DR went through DAQ system in rack room
- Further documentation on DATE implementation needed from YK
- Geometry head
- RB+DR interaction to document & detail geometry procedures has commenced.
Updated by Rajaram, Durga over 6 years ago ยท 1 revisions