Project

General

Profile

2016-08-23-MEMO-CSw » History » Version 2

Rajaram, Durga, 23 August 2016 14:13

1 1 Rajaram, Durga
h1. 2016-08-23-SwC
2
3
h2. Software & Computing Issues
4
5
Software & Computing Issues:
6
7
* Software
8
** Tracker:
9
*** Inefficiency at low pt: PK & AD to look at it
10
*** NaN bug: bug identified, pending fix in MAUS trunk
11
*** Charge reconstruction bug: has been flagged, tracker group to investigate
12
** TOF:
13
*** Discrepancy between TOF & tracker of ~100 ps: Scott Wilbur starting to investigate by looking at TOF0-TOF1 path-length effect
14
** Global: 
15
*** TRef issue in data structure holding back Global track matching from going into production processing. This has now been fixed -- need some performance tests before going into production.
16
** Field handling
17
*** Need to account for PRY effect in MAUS fields -- cumbersome (no manpower) to generate OPERA maps for each current setting
18
*** Correction factors (at 4T) received from HW/JP
19
*** Need to run some sample reconstruction with different scale factors to test
20
** MC:
21
*** G4BL generation is bottle neck
22
*** FD to look at this next
23
**** Consider TOF0 as G4BL-MAUS handoff point -- needs to be tested by pushing through both G4BL & MAUS and comparing
24
*** FD to provide G4BL generation scripts, DM will run them on GRID
25
**** Also need some versioning/book-keeping cleanup of G4BL inputs
26
27
* Infrastructure
28
** -Working on creating a DB table to hold alignment corrections to surveyed geometry- (#1817)
29
*** Table & associated software API have been created (JM), opened to developers, RB is testing
30
*** corrections will be applied at geometry download time, transparent for end-user
31
** Reconstruction quality table has been created along with API (JM)
32
*** Reco flags will come from a post-processing job
33
**** 4 bits for each detector (count 11 detectors including RFs from Cooling Demo)
34
*** DR developing post-processing & quality extraction infrastructure
35
36
* Data reprocessing
37
** Data to be re-processed with next MAUS release once tracker bugs are fixed
38
*** may have Global in this iteration as well
39
** Will like to have alignment corrections coming from the CDB table (above) for this round of processing
40
*** RB & JM away, so this might not converge for this release, but..
41
42
* 
43 2 Rajaram, Durga
|_.               |_.Issue                                                     |_.Responsible        |_.Status |
44
|Tracker               |NaN bug          |PK, AD           | To be fixed in trunk | 
45
|                           |Charge reconstruction            | PK, AD                     | To be investigated |
46
|                           |Inefficiency at low pt               |PK, AD                      | To be investigated | 
47
|Global                 |Data structure issue               |JG, AD                      | Possibly fixed |
48
|Geometry               |Alignment corrections from CDB          |RB, JM         | In testing | 
49
|MC                      |G4BL                                       |FD, DR, DM               | To be started |
50
|                           |Speed                                      |DR, AD                      | To be looked at |
51
|Infrastructure    |Reco quality                            |DR                             | In development |
52
|                           |DNS network issue                  |PF, DR                     | To investigate|