2016-03-21 Physics and Processing Requirements for IPAC » History » Version 2
Rogers, Chris, 21 March 2017 13:56
1 | 1 | Rogers, Chris | h1. 2016-03-21 Physics and Processing Requirements for IPAC |
---|---|---|---|
2 | |||
3 | Thinking about the "measurement of emittance evolution" paper |
||
4 | |||
5 | | *Measurement Bias* | *Mitigation/Estimation Strategy* | |
||
6 | | Detector Resolution | MC of "best guess" lattice | |
||
7 | | | Track extrapolation | |
||
8 | | Efficiency | MC of "best guess" lattice | |
||
9 | | | Track extrapolation | |
||
10 | | Tracker field magnitude | Hall probes give magnitude of uncertainty| |
||
11 | | | Dead reckoning with COMSOL gives magnitude of uncertainty | |
||
12 | | | MC with wrong current field gives magnitude of measurement error | |
||
13 | | Detector and SS alignment | Track extrapolation/residuals gives magnitude of uncertainty | |
||
14 | | | Survey probably doesn't help for SS and tracker | |
||
15 | | | MC with misalignment gives magnitude of measurement error | |
||
16 | | *Model Bias* | *Mitigation/Estimation Strategy* | |
||
17 | | Magnet Alignments | Track extrapolation/residuals gives magnitude of uncertainty | |
||
18 | | | Survey may help for FC | |
||
19 | | | MC with wrong current field/misalignments gives magnitude of MC uncertainty | |
||
20 | | Material Budget | LiH MICE note tells us material budget and uncertainty | |
||
21 | | | Thumb in air tells us He and window budget and uncertainty | |
||
22 | | | MC with wrong material budget gives magnitude of MC uncertainty | |
||
23 | |||
24 | Require: |
||
25 | |||
26 | * "Best guess" lattice and MC thereof |
||
27 | * Final version of MAUS Tracker recon/etc |
||
28 | * For each parameter, we might need, say, 4 MC jobs (small and large negative and positive offsets. Parameters are: |
||
29 | ** Current of each of 10 coils |
||
30 | ** Alignment of each of 3 modules - assume coil-by-coil alignment is okay; 3 position offsets and 2 tilts |
||
31 | ** Alignment of each of TKU and TKD - 3 position offsets and 2 tilts |
||
32 | ** LiH thickness |
||
33 | ** 2 Window thicknesses |
||
34 | * MC should be supported with appropriate back-of-envelope calculation. Fall back to back-of-the-envelope where possible... |
||
35 | |||
36 | Would like 100k muons inside analysis cuts for each MC job. |
||
37 | |||
38 | Other things I ignore: |
||
39 | * Apertures/uncertainty |
||
40 | * Anything else? |