Project

General

Profile

2015-03-10 physics coordinator report » History » Version 20

Rogers, Chris, 10 March 2015 15:11

1 1 Rogers, Chris
h1. physics coordinator report
2
3
* Step I papers:-
4 3 Rogers, Chris
** (Polarisation analysis - held up by dodgy EMR code)
5 1 Rogers, Chris
* Cooling demo paper:
6
** Secondary absorber did not present sufficient material to the beamline to
7
   shield the tracker, review of secondary absorber position which has caused
8
   delay to the paper.
9 20 Rogers, Chris
** Tried for a revision last week for review, it didn't work out, hope to have a
10
   revision by this week
11 1 Rogers, Chris
* Step IV papers:
12
** Status at http://micewww.pp.rl.ac.uk/analysis/analysis_dashboard.html
13 19 Rogers, Chris
** Trying to bring material physics people "out of the woodwork", conflict that Warwick + Glasgow both want to do MCS, no one wants dE/dx
14 1 Rogers, Chris
* Rogers is re-establishing selection/weighting algorithms (dead since 2007)
15 6 Rogers, Chris
** aim to drive an analysis of "physics block challenge" before MPB
16
** feed into review of data rate issues, etc.
17 1 Rogers, Chris
* Field mapping
18
** Blackmore/Cobb have a good analysis of the field axis in the FC, which does not 
19
   produce the "tails" ruining the fitting, hopeful that SS will follow in time
20
   for alignment beginning of April 
21 7 Rogers, Chris
* March/April running
22
** Rogers will be physics shifter on March 21st
23
** Trying to establish physics shifters on March 28th and following
24 1 Rogers, Chris
* June running
25
** Planning note in preparation, due Friday
26
** Discuss/finalise note at a meeting Thursday 19th
27 18 Rogers, Chris
** Tracker will not be able to get plan in time for the meeting, rogers to phone Melissa
28 14 Rogers, Chris
** EMR request one week data and additionally some cosmics
29 8 Rogers, Chris
** C+M request one week
30 15 Rogers, Chris
** TOF request calibration (1 or 2 shifts)
31 10 Rogers, Chris
** KL request cosmic data taking
32 1 Rogers, Chris
** Ckov request 1 shift
33 16 Rogers, Chris
** Beamline (hardware) request an activation run
34 10 Rogers, Chris
** Beamline (optics) not sure
35 11 Rogers, Chris
** Cooling channel first data may at some point come through, not sure