physics coordinator report¶
- Step I papers:-
- EMR data paper- VC talk, analysis completed and now in "write up" phase
- PID paper:- hung up on reconstruction issues; fixed unpacking has been run
but ADC response of the KL now looks different. Discussion Monday pm
- Cooling demo paper:
- Secondary absorber did not present sufficient material to the beamline to
shield the tracker, review of secondary absorber position which has caused
delay to the paper. - Tried for a revision this week for review, it didn't work out, hope to have a
revision by next week
- Secondary absorber did not present sufficient material to the beamline to
- Step IV papers:
- Rogers is re-establishing selection/weighting algorithms (dead since 2007)
- analysis of "physics block challenge"
- review of data rate issues, etc.
- Field mapping
- Blackmore/Cobb have a good analysis of the field axis in the FC, which does not
produce the "tails" ruining the fitting, hopeful that SS will follow in time
for alignment beginning of April
- Blackmore/Cobb have a good analysis of the field axis in the FC, which does not
- June running
- Planning note in preparation, due Friday
- Discuss/finalise note at a meeting Thursday 19th