2015-03-10 physics coordinator report » History » Revision 13
Revision 12 (Rogers, Chris, 10 March 2015 14:31) → Revision 13/20 (Rogers, Chris, 10 March 2015 14:31)
h1. physics coordinator report * Step I papers:- ** EMR data paper- VC talk, analysis completed and now in "write up" phase ** PID paper:- hung up on reconstruction issues; fixed unpacking has been run but ADC response of the KL now looks different. Discussion Monday pm ** (Polarisation analysis - held up by dodgy EMR code) * Cooling demo paper: ** Secondary absorber did not present sufficient material to the beamline to shield the tracker, review of secondary absorber position which has caused delay to the paper. ** Tried for a revision this week for review, it didn't work out, hope to have a revision by next week * Step IV papers: ** Status at http://micewww.pp.rl.ac.uk/analysis/analysis_dashboard.html ** Trying to bring material physics people "out of the woodwork" * Rogers is re-establishing selection/weighting algorithms (dead since 2007) ** aim to drive an analysis of "physics block challenge" before MPB ** feed into review of data rate issues, etc. * Field mapping ** Blackmore/Cobb have a good analysis of the field axis in the FC, which does not produce the "tails" ruining the fitting, hopeful that SS will follow in time for alignment beginning of April * March/April running ** Rogers will be physics shifter on March 21st ** Trying to establish physics shifters on March 28th and following * June running ** Planning note in preparation, due Friday ** Discuss/finalise note at a meeting Thursday 19th ** Tracker will not be able to get plan in time for the meeting ** Beamline (hardware) request an activation run ** EMR request one week ** C+M request one week ** TOF request 1 shift calibration data ** KL request cosmic data taking ** Ckov request roughly 1 shift day ** Beamline (optics) not sure ** Cooling channel first data may at some point come through, not sure