Project

General

Profile

Actions

2014-06-10-MEMO-computing

  • [[computing-software:Project|New draft of the full computing project plan]]
  • Online - Paul Smith is at RAL
    • checking online control room elements are operating properly in advance of running on 23rd
    • running up documentation
  • Controls - Pierrick has been away
    • Controls plan added to the computing project
    • Plan to shake down control room in advance of running on 23rd
  • MAUS - release 0.8.5 is now out
    • Essentially a patch release
    • Will probably attempt GRID batch production against this release (waiting on confirmation from Durga)
    • Added Scientific Linux version 6 test box to the testing infrastructure
    • Added Load tests (reconstruct a 6 GB data run)
  • Infrastructure - everything running smoothly
  • CM agenda
    • Online
      • Online Group Update and Plans: Smith (20 mins)
      • Spares : Macwaters (10 mins)
      • DAQ Overview : Yordan (20 mins)
      • Discussion: (30 mins)
      • ACTION: chase up Adey/tracker with Ken Long and Bross
    • MAUS
      • MAUS status schedule - Durga Rajaram (20)
      • CDB and Batch Processing status - Janusz Martyniak (20)
      • Geometry - Bayes/Ricciardi (20) -- could potentially move this into Analysis if the AG feels it'll be relevant
      • TOF- Durga Rajaram (20)
      • Ckov MC - Lucien Cremaldi (20)
      • EMR - Francois Drielsma (20)
      • Tracker Reco - Adam Dobbs (20)
      • Tracker MC - Chris Heidt (20)
      • Global Tracking - Jan Greis (20)
      • Global PID - Celeste Pidcott (20)
      • MAUS Online - Chris Rogers (20)
    • To fold into Analysis+Software
      • MC Beam - John Nugent (analysis) (20)
      • KL MC - Mariyan Bogomilov/John Nugent (20)
      • Tracker Emittance studies(?) - Chris Hunt (20)
      • MC generation for Analysis (20)
      • MAUS-Analysis interface (20)
    • CaM
    • Infrastructure
      • PPD Computing Systems: Rogers (20 mins)
      • GRID: Nebrensky/Martyniak (20 mins)
      • CDB: Martyniak (20 mins)
      • Discussion: (20 mins)
  • MPB/RLSR actions
    • 9. Control system training/docs for ISIS - Rogers to give ISIS a reminder (Zoe Bowden was away last two weeks)
    • 10. Control system plan - stands
    • 12. On-site support of online systems - stands
    • 13. Integrate online and offline schedules - stands
    • 14. Tracking methodology - stands

Updated by Rogers, Chris almost 9 years ago ยท 12 revisions