Project

General

Profile

Actions

Validated Geometries

Geometry ID Start Date Upload Date Comment Validation Figures
43 1974-02-10 2014-10-14 Idealized Step IV geometry. To be used with Mice Module translation. Used for first pass of physics simulations.
44 1974-02-10 2014-10-15 Idealized Step IV geometry. To be used with Mice Module translation. Same as 43
45 2034-01-01 2014-11-04 Idealized Step IV geometry. To be used with Mice Module translation. Use for first pass grid simulations.
46 2011-12-01 2015-01-07 Step I geometry as used for the runs used in the KL pid studies. Will fail tests because there are no elements in the channel region.
47 2013-10-06 2015-01-07 Step I geometry as from surveys of the EMR commissioning run.
48 2034-01-02 2015-01-07 Idealized Step IV geometry with tracker positions corrected by 78 mm relative to id 45.
68 2015-07-13 2015-01-07 Step IV as built geometry. Valid following move of EMR, TOF2, and KL on July 13 2015. No absorber present in the focus coil. Air is used in trackers rather than helium. Includes G4Bl deck. The magnetic coil positions and orientations have been corrected to match the positions and orientations for the solenoids in the hall coordinates. Corrected Maus Information file to correctly write the position information to the Parent Geometry File observing the information from the fits to the surveys. The tracker information will also be added to the Parent Geometry File.

Updated by Bayes, Ryan about 8 years ago · 8 revisions