Actions
TOF-Review-Mtg3¶
June 18, 2018¶
Status of Issues¶
Bad channels¶
- Channels with holes in the ADC distribution (VP)
- ACTION Need code for blacklisting: done
- ACTION Implement code in calibration (VP): done
- ACTION Implement code in reconstruction (DR): done
Calibration¶
- Status (VP/SW)
- ACTION: VP to generate calibrations: done
- ACTION: reconstruct with new calibrations: done
- Then, to check:
- ACTION: is the dT offset issue resolved?
- ACTION: what is the TOF2 efficiency
Reconstruction¶
- 0.5ns cut should be loosened
- New cut = ? (VP)
- ACTION: Implement new cut (DR): done
AOB¶
Dial-in http://mice.iit.edu/phonebridge.html¶
Some TOF Space Point Performance Plots
Updated by Pec, Viktor over 5 years ago ยท 5 revisions