Project

General

Profile

Actions

TOF-Review-Mtg2

June 4, 2018

Status of Issues

Bad channels

  • Channels with holes in the ADC distribution (VP)
    • How many channels?
    • Run range
  • Any other bad channels/features?
  • Need code for blacklisting
    • Implement code in calibration (VP)
    • Implement code in reconstruction (DR)

Calibration

  • Status (VP/SW)
    • Status of improved tw fits (SW/VP)
    • VP reported there were some issues with weird TW distributions, and issues getting the T0 calibration to work.
    • VP to check with SW on data used for calibration input
  • Need to verify/understand:
    • is the dT offset issue resolved?
    • what is the TOF2 efficiency

Reconstruction

  • 0.5ns cut should be loosened
    • New cut = ? (VP)
    • Implement new cut (DR)

AOB


Dial-in http://mice.iit.edu/phonebridge.html


Next meeting

  • Mon June 18, 9am

Prev.mtg
------

Updated by Pec, Viktor over 5 years ago ยท 7 revisions