Wednesday 24th September 2014 at 15:00 RAL

Agenda

  • Release status
    • Current release = 0.9.1
      • Memory leak fixes #1489
      • Added GEANT fine-grained production threshold
      • Geometry - updates, ckov
      • TOF Calibrations by-run
      • KL Calibrations to DB
      • KL MC tuning
    • Targets for future release:
      • EMR -- digitization
      • EMR -- reconstruction
      • Trigger MC
      • DAQ maps to DB #1375 (needs #994)
  • Detectors
    • Detector integration (Durga Rajaram)
    • Tracker (Adam Dobbs)
      • Space-point, track-finding efficiency studies partly blocked by lack of trigger #1182
      • ACTION: flag low pt for downstream reconstruction
      • ACTION: ADC smearing, Cosmic data -- need input from David Adey
      • ACTION: Meeting when MC noise algorithm design (CH) is in place.
      • ACTION: A.Dobbs to check with Santos on sched updates and pending issues
    • TOF (Durga Rajaram)
    • EMR (Francois Drielsma)
      • MC #1033
      • ACTION: Francois to push his code to lp
      • does the "extra events" from EMR affect MC trigger formation?
        • Communication from François: code is in private branch on lp, MC digitizer v1 is complete, Reconstruction being worked on
    • KL (Mariyan Bogomilov)
      • STANDING: MC validation, optimization, tuning, #1411
    • RealData (Yordan Karadzhov)
      • DAQ channel maps to DB (Rajaram) #1375, blocked by #994
    • Ckov (Drews/Winter/Rajaram)
    • Global Recon (Jan Greis/Celeste Pidcott)
      • ACTION: Need uncertainties from detector reconstructions. Uncertainties on track points, momenta; Uncertainties on tof time. How? Also will need datastructure modifications once we understand how to get the uncertainties
    • Tracking (Greis)
    • PID (Pidcott)
    • Monte Carlo trigger (Ryan Bayes) #1182
      • ACTION: DR restructure TOF Digi and incorporate MapCppTrigger
  • Infrastructure
    • Geometry/MC (Stefania Ricciardi/Ryan Bayes)
      • ACTION: Tracker geometry -- He windows are in, but waiting for expert guidance on actual position
      • ACTION: Survey nest positions from detectors -- should be handled via CDB table. Specification needed for Janusz to implement this
  • Speed improvements (Bayes)
    • see 21 July Geometry meeting
  • MC Beam
    • Standing: There is a request to have G4BL decks in the CDB. JN will handle the interface code
  • GRID and Batch Production (Chris Rogers/Janusz Martyniak)
    • Try grid running again? #1489
  • Code deployment (All)
  • Documentation
  • Data Structure
  • AOB
  • Date of next meeting October 8 2014

International Toll-Free Dial-in numbers

  • Switzerland: 0800705351
  • UK: 08004960576
  • US: 1-866-740-1260
  • Other numbers
    Access Code: 5673390

Notes

Attendance

KL

Ckov

EMR

Tracker

TOF

Global

MC

Geometry

G4BL

GRID

Build system

Infrastructure

Miscellaneous

Updated by Rajaram, Durga about 9 years ago · 9 revisions