PC22062016 » History » Version 8

Dobbs, Adam, 22 June 2016 15:07

1 1 Dobbs, Adam
h1. PC22062016
2
3
Wednesday 22nd June 2016 at 15:00 BST
4
5
{{>toc}}
6
7
h2. Summary of Actions
8
9
|_.Task |_.Person |_.Added |_.Issue Number |_.Comment |
10 6 Dobbs, Adam
|Fix InputCppRootData TRefArray data storage |A. Dobbs |08/06/2016 |1856 | |
11 1 Dobbs, Adam
|Add new onrec as MAUS third party |Y. Karadzhov |13/04/2016 |- | |
12
|Add "MC run number" somewhere |D. Rajaram |13/04/2016 |- | |
13
|Urgently need validation plot from detectors to integrate with geometry & reconstruction to make sure geometry+reco is OK |D. Rajaram |03/02/2016 | | "Examples at the bottom":http://micewww.pp.rl.ac.uk/projects/maus/wiki/ProductionValidation123 |
14
|Fix Pattern Recognition bugs that cause loss in efficiency |A. Dobbs |06/01/16 |#1807 |Done for straights |
15
|Add data_analyzable flag for each detector in post processing to CDB | Detector software heads |16/09/2015 |#1585 | |
16
|Fix close to paraxial tracks producing nan output |C. Hunt |- |- |  |
17
18
h2. Release status
19
20 3 Dobbs, Adam
* Current release = 2.5.0
21 1 Dobbs, Adam
22 3 Dobbs, Adam
* Targets for release 2.6.0:
23 5 Dobbs, Adam
** Tracker Kalman integration tests
24 1 Dobbs, Adam
25
* Targets for future release:
26
** Third party -- CDB interface update
27
** Tracker -- optimise helical pattern recognition
28
** Framework -- trigger MC
29
30
31
h2. Schedule
32
33
* attachment:2016-06-22_MAUS-Schedule.ods
34
35
h2. Detectors
36
37
* Detector integration (D. Rajaram)
38
**  *ACTION*: Add data_analyzable flag for each detector in post processing to CDB (*Detector software heads*) #1585, #1689
39
* Tracker (P. Kyberd)
40
** *ACTION* Fix tracker MC no MCS x' 1s.d. deviation bug (*C. Hunt*)
41
** *ACTION* Fix Pattern Recognition bugs that cause loss in efficiency #1807 (*A. Dobbs*)
42
** Space-point, track-finding efficiency studies partly blocked by lack of trigger #1182
43
** *ACTION*: Fix close to paraxial tracks producing nan output (*C. Hunt*)
44
* TOF (D. Rajaram)
45
** Restructure TOF MC Digitizer - part of trigger MC (*D. Rajaram*)
46
* EMR (F. Drielsma)
47
* KL (M. Bogomilov)
48
* CKOV (A. Liu, D. Rajaram)
49
** Calibration
50
** Validate CKOV MC against data
51
52
h2. Global Reconstruction
53
54
* Tracking (J. Greis)
55
* PID (C. Pidcott)
56
57
h2. Monte Carlo
58
59
* Monte Carlo trigger (D. Rajaram) #1182
60
** Restructure TOF Digitisation and incorporate MapCppTrigger (*D. Rajaram*)
61
62
h2. Geometry and CDB
63
64
h2. G4BeamLine
65
66
h2. Online Reconstruction
67
68
* New online framework should be added to MAUS as a third party (Y. Karadzhov)
69
* Software On Call (A. Dobbs)
70
** http://micewww.pp.rl.ac.uk/projects/maus/wiki/Software_on-call (SOC wiki)
71
72
h2. Batch Offline Reconstruction
73
74
* GRID MC running
75
* Offline Rec running with 2.4.0
76
77
h2. Infrastructure
78
79
* *ACTION* Fix InputCppRootData TRefArray data storage (*A. Dobbs*)
80
* Fix problems when setting header_and_footer_mode to "dont_append" (*C. Rogers*, *C. Pidcott*) 
81
82
h2. Performance
83
84
* Speed improvements for MC
85
86
h2. Tools
87
88
h3. Event Viewer
89
90
h2. Documentation
91
92
* Update tracker (C. Heidt)
93
* Update geometry (R. Bayes)
94
95
h2. AOB
96
97
h2. International Toll-Free Dial-in numbers
98
99
* Switzerland:	0800705351
100
* UK:	08004960576
101
* US:	1-866-740-1260
102
* "Other numbers":http://www.readytalk.com/an.php?tfnum=8667401260
103
* Access Code: 5673390
104
105
h2. Notes
106
107
h3. Attendance
108
109
h3. Release Status
110
111
h3. Schedule
112
113
h3. Detectors
114
115
* All detectors
116
** Detector analyzable flag
117
* KL
118
* Ckov
119
* EMR
120
* Tracker
121
* TOF
122
123
h3. Global Reconstruction
124
125
h3. Monte Carlo
126
127
h3. Geometry and CDB
128
129
h3. G4BeamLine
130
131
h3. Online Reconstruction
132
133
h3. Batch Offline Reconstruction
134
135
h3. Infrastructure
136
137
h3. Performance
138
139
h3. Tools
140
141
* Event Viewer
142
143
h3. AOB
144
145 2 Dobbs, Adam
Next meeting: 6th July 2016