Project

General

Profile

PC22062016 » History » Version 3

Dobbs, Adam, 22 June 2016 15:04

1 1 Dobbs, Adam
h1. PC22062016
2
3
Wednesday 22nd June 2016 at 15:00 BST
4
5
{{>toc}}
6
7
h2. Summary of Actions
8
9
|_.Task |_.Person |_.Added |_.Issue Number |_.Comment |
10
|Fix InputCppRootData TRefArray data storage |A. Dobbs |08/06/2016 |- | |
11
|Fix tracker MC no MCS x' 1s.d. deviation bug |C. Hunt |08/06/2016 |- | |
12
|Fix Global memory leak |M. Uchida |25/05/2016 |- | |
13
|Add new onrec as MAUS third party |Y. Karadzhov |13/04/2016 |- | |
14
|Add "MC run number" somewhere |D. Rajaram |13/04/2016 |- | |
15
|Urgently need validation plot from detectors to integrate with geometry & reconstruction to make sure geometry+reco is OK |D. Rajaram |03/02/2016 | | "Examples at the bottom":http://micewww.pp.rl.ac.uk/projects/maus/wiki/ProductionValidation123 |
16
|Fix Pattern Recognition bugs that cause loss in efficiency |A. Dobbs |06/01/16 |#1807 |Done for straights |
17
|Add data_analyzable flag for each detector in post processing to CDB | Detector software heads |16/09/2015 |#1585 | |
18
|Fix close to paraxial tracks producing nan output |C. Hunt |- |- |  |
19
20
h2. Release status
21
22 3 Dobbs, Adam
* Current release = 2.5.0
23 1 Dobbs, Adam
24 3 Dobbs, Adam
* Targets for release 2.6.0:
25 1 Dobbs, Adam
26
* Targets for future release:
27
28
** Third party -- CDB interface update
29
** Tracker -- optimise helical pattern recognition
30
** Framework -- trigger MC
31
32
33
h2. Schedule
34
35
* attachment:2016-06-22_MAUS-Schedule.ods
36
37
h2. Detectors
38
39
* Detector integration (D. Rajaram)
40
**  *ACTION*: Add data_analyzable flag for each detector in post processing to CDB (*Detector software heads*) #1585, #1689
41
* Tracker (P. Kyberd)
42
** *ACTION* Fix tracker MC no MCS x' 1s.d. deviation bug (*C. Hunt*)
43
** *ACTION* Fix Pattern Recognition bugs that cause loss in efficiency #1807 (*A. Dobbs*)
44
** Space-point, track-finding efficiency studies partly blocked by lack of trigger #1182
45
** *ACTION*: Fix close to paraxial tracks producing nan output (*C. Hunt*)
46
* TOF (D. Rajaram)
47
** Restructure TOF MC Digitizer - part of trigger MC (*D. Rajaram*)
48
* EMR (F. Drielsma)
49
* KL (M. Bogomilov)
50
* CKOV (A. Liu, D. Rajaram)
51
** Calibration
52
** Validate CKOV MC against data
53
54
h2. Global Reconstruction
55
56
* Tracking (J. Greis)
57
* PID (C. Pidcott)
58
59
h2. Monte Carlo
60
61
* Monte Carlo trigger (D. Rajaram) #1182
62
** Restructure TOF Digitisation and incorporate MapCppTrigger (*D. Rajaram*)
63
64
h2. Geometry and CDB
65
66
h2. G4BeamLine
67
68
h2. Online Reconstruction
69
70
* New online framework should be added to MAUS as a third party (Y. Karadzhov)
71
* Software On Call (A. Dobbs)
72
** http://micewww.pp.rl.ac.uk/projects/maus/wiki/Software_on-call (SOC wiki)
73
74
h2. Batch Offline Reconstruction
75
76
* GRID MC running
77
* Offline Rec running with 2.4.0
78
79
h2. Infrastructure
80
81
* *ACTION* Fix InputCppRootData TRefArray data storage (*A. Dobbs*)
82
* Fix problems when setting header_and_footer_mode to "dont_append" (*C. Rogers*, *C. Pidcott*) 
83
84
h2. Performance
85
86
* Speed improvements for MC
87
88
h2. Tools
89
90
h3. Event Viewer
91
92
h2. Documentation
93
94
* Update tracker (C. Heidt)
95
* Update geometry (R. Bayes)
96
97
h2. AOB
98
99
h2. International Toll-Free Dial-in numbers
100
101
* Switzerland:	0800705351
102
* UK:	08004960576
103
* US:	1-866-740-1260
104
* "Other numbers":http://www.readytalk.com/an.php?tfnum=8667401260
105
* Access Code: 5673390
106
107
h2. Notes
108
109
h3. Attendance
110
111
h3. Release Status
112
113
h3. Schedule
114
115
h3. Detectors
116
117
* All detectors
118
** Detector analyzable flag
119
* KL
120
* Ckov
121
* EMR
122
* Tracker
123
* TOF
124
125
h3. Global Reconstruction
126
127
h3. Monte Carlo
128
129
h3. Geometry and CDB
130
131
h3. G4BeamLine
132
133
h3. Online Reconstruction
134
135
h3. Batch Offline Reconstruction
136
137
h3. Infrastructure
138
139
h3. Performance
140
141
h3. Tools
142
143
* Event Viewer
144
145
h3. AOB
146
147 2 Dobbs, Adam
Next meeting: 6th July 2016