Project

General

Profile

PC22062016 » History » Version 10

Dobbs, Adam, 22 June 2016 15:13

1 1 Dobbs, Adam
h1. PC22062016
2
3
Wednesday 22nd June 2016 at 15:00 BST
4
5
{{>toc}}
6
7
h2. Summary of Actions
8
9
|_.Task |_.Person |_.Added |_.Issue Number |_.Comment |
10 6 Dobbs, Adam
|Fix InputCppRootData TRefArray data storage |A. Dobbs |08/06/2016 |1856 | |
11 1 Dobbs, Adam
|Add new onrec as MAUS third party |Y. Karadzhov |13/04/2016 |- | |
12
|Add "MC run number" somewhere |D. Rajaram |13/04/2016 |- | |
13
|Urgently need validation plot from detectors to integrate with geometry & reconstruction to make sure geometry+reco is OK |D. Rajaram |03/02/2016 | | "Examples at the bottom":http://micewww.pp.rl.ac.uk/projects/maus/wiki/ProductionValidation123 |
14
|Fix Pattern Recognition bugs that cause loss in efficiency |A. Dobbs |06/01/16 |#1807 |Done for straights |
15
|Add data_analyzable flag for each detector in post processing to CDB | Detector software heads |16/09/2015 |#1585 | |
16
|Fix close to paraxial tracks producing nan output |C. Hunt |- |- |  |
17
18
h2. Release status
19
20 3 Dobbs, Adam
* Current release = 2.5.0
21 1 Dobbs, Adam
22 3 Dobbs, Adam
* Targets for release 2.6.0:
23 5 Dobbs, Adam
** Tracker Kalman integration tests
24 1 Dobbs, Adam
25
* Targets for future release:
26
** Tracker -- optimise helical pattern recognition
27
** Framework -- trigger MC
28
29
h2. Schedule
30
31
* attachment:2016-06-22_MAUS-Schedule.ods
32
33
h2. Detectors
34
35
* Detector integration (D. Rajaram)
36
**  *ACTION*: Add data_analyzable flag for each detector in post processing to CDB (*Detector software heads*) #1585, #1689
37
* Tracker (P. Kyberd)
38
** *ACTION* Fix tracker MC no MCS x' 1s.d. deviation bug (*C. Hunt*)
39
** *ACTION* Fix Pattern Recognition bugs that cause loss in efficiency #1807 (*A. Dobbs*)
40
** Space-point, track-finding efficiency studies partly blocked by lack of trigger #1182
41
** *ACTION*: Fix close to paraxial tracks producing nan output (*C. Hunt*)
42
* TOF (D. Rajaram)
43
** Restructure TOF MC Digitizer - part of trigger MC (*D. Rajaram*)
44
* EMR (F. Drielsma)
45
* KL (M. Bogomilov)
46
* CKOV (A. Liu, D. Rajaram)
47
** Calibration
48
** Validate CKOV MC against data
49
50
h2. Global Reconstruction
51
52
* Tracking (J. Greis)
53
* PID (C. Pidcott)
54
55
h2. Monte Carlo
56
57
* Monte Carlo trigger (D. Rajaram) #1182
58
** Restructure TOF Digitisation and incorporate MapCppTrigger (*D. Rajaram*)
59
60
h2. Geometry and CDB
61
62
h2. G4BeamLine
63
64
h2. Online Reconstruction
65
66
* New online framework should be added to MAUS as a third party (Y. Karadzhov)
67
* Software On Call (A. Dobbs)
68
** http://micewww.pp.rl.ac.uk/projects/maus/wiki/Software_on-call (SOC wiki)
69
70
h2. Batch Offline Reconstruction
71
72
* GRID MC running
73 10 Dobbs, Adam
* Offline Rec running with 2.5.0
74 1 Dobbs, Adam
75
h2. Infrastructure
76
77
* *ACTION* Fix InputCppRootData TRefArray data storage (*A. Dobbs*)
78
* Fix problems when setting header_and_footer_mode to "dont_append" (*C. Rogers*, *C. Pidcott*) 
79
80
h2. Performance
81
82
* Speed improvements for MC
83
84
h2. Tools
85
86
h3. Event Viewer
87
88
h2. Documentation
89
90
* Update tracker (C. Heidt)
91
* Update geometry (R. Bayes)
92
93
h2. AOB
94
95
h2. International Toll-Free Dial-in numbers
96
97
* Switzerland:	0800705351
98
* UK:	08004960576
99
* US:	1-866-740-1260
100
* "Other numbers":http://www.readytalk.com/an.php?tfnum=8667401260
101
* Access Code: 5673390
102
103
h2. Notes
104
105
h3. Attendance
106
107
h3. Release Status
108
109
h3. Schedule
110
111
h3. Detectors
112
113
* All detectors
114
** Detector analyzable flag
115
* KL
116
* Ckov
117
* EMR
118
* Tracker
119
* TOF
120
121
h3. Global Reconstruction
122
123
h3. Monte Carlo
124
125
h3. Geometry and CDB
126
127
h3. G4BeamLine
128
129
h3. Online Reconstruction
130
131
h3. Batch Offline Reconstruction
132
133
h3. Infrastructure
134
135
h3. Performance
136
137
h3. Tools
138
139
* Event Viewer
140
141
h3. AOB
142
143 2 Dobbs, Adam
Next meeting: 6th July 2016