PC100914¶
Wednesday 10th September 2014 at 15:00 RAL
Agenda¶
- Release status
- Schedule(All): 100914_Software_and_Computing_copy.ods
- Detectors
- Detector integration (Durga Rajaram)
- Tracker (Adam Dobbs)
- Space-point, track-finding efficiency studies partly blocked by lack of trigger #1182
- ACTION: flag low pt for downstream reconstruction
- ACTION: ADC smearing, Cosmic data -- need input from David Adey
- ACTION: MC ADC-modeling refactor
- TOF (Durga Rajaram)
calibration by-run getter having CDB issues#1519push to trunk
- EMR (Yordan Karadzhov/Francois Drielsma)
- MC #1033
- ACTION: Francois to push his code to lp
- does the "extra events" from EMR affect MC trigger formation?
- Communication from François: code is in private branch on lp, MC digitizer v1 is complete, Reconstruction being worked on
- KL (Mariyan Bogomilov)
- STANDING: MC validation, optimization, tuning, #1411
- RealData (Yordan Karadzhov)
- Ckov (Drews/Winter/Rajaram)
- Finalize geometry
- ACTION:
DR get Lucien's geometry into MAUS- does the MiceModules code need change? Material definitions?
- Global Recon (Jan Greis/Celeste Pidcott)
- ACTION: Need uncertainties from detector reconstructions. Uncertainties on track points, momenta; Uncertainties on tof time. How? Also will need datastructure modifications once we understand how to get the uncertainties
- Tracking (Greis)
- PID (Pidcott)
- Monte Carlo trigger (Ryan Bayes) #1182
- ACTION: DR to look over fix build issues
- restructure TOF digi?
- Infrastructure
- Geometry/MC (Stefania Ricciardi/Ryan Bayes)
Ckov geometry update (Cremaldi)- need positions of survey nests from detector groups
- Geometry/MC (Stefania Ricciardi/Ryan Bayes)
- Speed improvements (Bayes)
- see 21 July Geometry meeting
- MC Beam
- Standing: There is a request to have G4BL decks in the CDB. JN will handle the interface code
- ACTION: MapPyBeamMaker gets appropriate currents for requested run -- get this code into the trunk
- GRID and Batch Production (Chris Rogers/Janusz Martyniak)
- #1489 grid processing on hold because of memory leak
- Memory usage ~2.5 GB
- Try grid running again?
- Code deployment (All)
- Documentation
- Data Structure
- Online
- Online data quality (Chris Rogers)
- Have prototype GUI and prototype ROOT-based document DB to replace maus-web-app and django #1312
- Software On Call (Durga Rajaram)
- Online data quality (Chris Rogers)
- AOB
- Date of next meeting September 24 2014
International Toll-Free Dial-in numbers¶
- Switzerland: 0800705351
- UK: 08004960576
- US: 1-866-740-1260
- Other numbers
Access Code: 5673390
Notes¶
Attendance¶
Ryan Bayes
Adam Dobbs
Chris Heidt
Chris Hunt
John Nugent
Celeste Pidcott
Chris Rogers
KL¶
- Calibrations are in DB
- If run-by-run dependence is anticipated, need to update interface code to handle it (DR)
- Validation is as good as it gets, tuning might keep ticking along until at least PID paper completion
Ckov¶
- Updated geometry in trunk
- MC need to check if Lucien's student is going to do it, if not DR
EMR¶
- François has v1 of digitizer in his branch - would like to get this into the trunk after tests are written
- Reconstruction (track) in progress - FD says CM40 is a realistic deadline to get this in
Tracker¶
- D.Adey suggests changing the ADC modeling to reflect p.e. drop-off on some of the boards (saturation?)
- C.Heidt to rework the digitizer - consensus to have a meeting when algorithm design is in place
- Several updates from Santos on Kalman, seems to improve things. A.Dobbs to check with Santos on sched updates and pending issues
- Would like to get some cosmic data before March; means need DAQ-unpacking issues resolved before then.
TOF¶
- understand resolutions from latest calibrations (DR/YK)
Global¶
- Global meetings have been on hold, hoping to get them restarted next week
MC¶
Geometry¶
- Tracker geometry -- He windows are in, but waiting for expert guidance on actual position
- issues with GDML implementation due to overlap volumes coming from CAD drawings. RB has asked JT for drawings without overlaps. Waiting.
- survey nest positions from detectors -- should be handled via CDB table.
- A: specification needed for Janusz to implement this
G4BL¶
- JN's KL and G4BL region updates are in his branch, DR to pull them in.
GRID¶
- CR to take a look at OutputCpp ROOT-mess re freeing memory.
- Try to run batch again with next release
- RB coming up with specs for running batch MC. Will only have TOF/Tracker/KL digitizers but that's probably good enough to do emittance reconstruction sims
Build system¶
Infrastructure¶
Miscellaneous¶