Project

General

Profile

PC040614 » History » Version 9

Rajaram, Durga, 04 June 2014 14:44

1 1 Rajaram, Durga
h1. PC040614
2
3 2 Rajaram, Durga
Wednesday 3rd June 2014 at 15:00 RAL
4 1 Rajaram, Durga
5
h2. Agenda
6
7
* Release status
8 3 Rajaram, Durga
** Current Release = 0.8.4
9 1 Rajaram, Durga
*** EMR geometry, sensitive detector
10
*** Physics model - polarized decay
11
*** Spin tracking
12
*** Geometry update
13
*** G4BL update
14
*** PID VarB - tof + tracker
15
*** String/Json/Cpp conversion API
16
*** Memory leak fix
17 8 Rajaram, Durga
** Patch release = 0.8.5
18
*** pending merge back
19 3 Rajaram, Durga
*** Physics list bug fix
20
*** Ckov empty data bug fix
21 9 Rajaram, Durga
** Targets for next release:
22
*** Tracker updates and fixes
23 1 Rajaram, Durga
*** Close Json/Cpp conversion #1376
24 9 Rajaram, Durga
**** Cpp Maps updated in trunk
25 3 Rajaram, Durga
*** Ckov geometry
26 9 Rajaram, Durga
** Wish-list for future release
27
*** EMR -- digitization,  reconstruction
28 1 Rajaram, Durga
*** KL Digitization tune
29
*** DAQ maps to DB #1375 (needs #994)
30
31
32 7 Rajaram, Durga
** Schedule(All): attachment:040614_Software_and_Computing.ods
33 1 Rajaram, Durga
34
** Detectors
35
*** Detector integration (Durga Rajaram)
36
*** Tracker (Adam Dobbs)
37 4 Rajaram, Durga
**** -Station-numbering bug #1437-
38 1 Rajaram, Durga
**** Add station-z to data structure #1438 
39 4 Rajaram, Durga
**** Nan bug #1454 - fixed in tracker devel(to be tested)
40
***** ACTION: merge into trunk
41 1 Rajaram, Durga
**** *ACTION*: flag low pt for downstream reconstruction
42
**** Space-point, track-finding efficiency studies partly blocked by lack of trigger #1182
43 5 Rajaram, Durga
**** *ACTION*: Combine PR, Kalman integration test items into one in spreadsheet
44
**** *ACTION*: DR to look at integration tests, see if we need more
45
**** *ACTION*: AD circulate schedule to tracker group and get an update on Kalman
46 1 Rajaram, Durga
**** *ACTION*: Ryan to have a face-to-face with Adam  and Heidt later in the month re geometry interface
47
*** TOF (Durga Rajaram)
48
**** TOF Calibration - integration with MAUS
49
*** EMR (Yordan Karadzhov/Francois Drielsma)
50
**** -Finalize geometry-
51
**** MC #1033
52
**** Track Reconstruction
53 4 Rajaram, Durga
**** *ACTION*: Francois to push his code to lp
54 1 Rajaram, Durga
*** KL (Mariyan Bogomilov)
55
**** Validation/optimization #1411
56
**** *ACTION*: JN to make comparison plots available to help with tuning and optimization
57
*** RealData (Yordan Karadzhov)
58
**** DAQ channel maps to DB (Rajaram) #1375, blocked by #994
59
*** Ckov (Drews/Winter/Rajaram)
60
**** Finalize geometry
61 4 Rajaram, Durga
***** Cremaldi + student have shown me what they have, to push to lp
62
**** *ACTION* DR get Lucien's geometry into MAUS
63 1 Rajaram, Durga
*** Global Recon (Jan Greis/Celeste Pidcott)
64
*** PID (Pidcott)
65 4 Rajaram, Durga
*** CP working on pulling KL and Ckov into PID, requires modifying the datastructure
66 1 Rajaram, Durga
*** Monte Carlo trigger (Ryan Bayes) #1182
67
**** RB reported an issue resizing recon_events in datastructure, after setting #trig events, DR to look
68
**** restructure TOF digi?
69
** Infrastructure
70
*** Geometry/MC (Stefania Ricciardi/Ryan Bayes)
71
**** Ckov legacy cleanup (Cremaldi)
72
**** need positions of survey nests from detector groups
73
**** need input on diffuser thickness
74
**** Speed improvements (Bayes)
75
*** MC Beam
76
**** -G4Beamline documentation-
77 4 Rajaram, Durga
**** There is a request to have G4BL decks in the CDB. JN will handle the interface code, JN to see what's in the DB and decide if it needs a new table
78 1 Rajaram, Durga
*** GRID and Batch Production (Chris Rogers/Janusz Martyniak)
79
**** -Memory leak: #1456-
80
*** Code deployment (All)
81
**** -Memory leaks in MAUS #1431-
82
*** Documentation
83 4 Rajaram, Durga
**** -doxy doc has relative path issues -- should be fixed in upcoming release-
84 1 Rajaram, Durga
*** Data Structure
85
**** Standardize conversion from string/json to cpp #1376 (Rogers)
86
***** API done
87 4 Rajaram, Durga
***** -CR working on modifying mappers-
88 1 Rajaram, Durga
***** Input and Reducer as well?
89
** Online
90
*** Online data quality (Chris Rogers)
91
**** Have prototype GUI and prototype ROOT-based document DB to replace maus-web-app and django #1312
92
*** Software On Call (Durga Rajaram)
93
**** June run
94
****  http://micewww.pp.rl.ac.uk/projects/maus/wiki/Software_on-call (SOC wiki)
95
* AOB
96 4 Rajaram, Durga
** Software Workshop: June 23-24 -- Monday, Tuesday before CM 39 
97
*** Note: At RAL
98 1 Rajaram, Durga
** Step IV Readiness
99
** *ACTION*: CR to make computing project spreadsheet available to link with rest of Step IV readiness schedule
100 4 Rajaram, Durga
** -Would like an SL6 box for testing, there are errors showing up on 64-bit SL6 that are masked on SL5-
101
* Date of next meeting June 18 2014
102 1 Rajaram, Durga
103
h2. International Toll-Free Dial-in numbers
104
105
* Switzerland:	0800705351
106
* UK:	08004960576
107
* US:	1-866-740-1260
108
* "Other numbers":http://www.readytalk.com/an.php?tfnum=8667401260
109
*Access Code: 5673390*
110
111
h2. Notes
112
113
h3. Attendance
114
115
h3. KL
116
117
h3. Ckov
118
119
h3. EMR
120
121
h3. Tracker
122
123
h3. TOF
124
125
h3. Global
126
127
h3. MC
128
129
h4. G4BL
130
131
h3. Build system
132
133
h3. Miscellaneous