Project

General

Profile

PC040614 » History » Version 3

Rajaram, Durga, 03 June 2014 22:56

1 1 Rajaram, Durga
h1. PC040614
2
3 2 Rajaram, Durga
Wednesday 3rd June 2014 at 15:00 RAL
4 1 Rajaram, Durga
5
h2. Agenda
6
7
* Release status
8 3 Rajaram, Durga
** Current Release = 0.8.4
9 1 Rajaram, Durga
*** EMR geometry, sensitive detector
10
*** Physics model - polarized decay
11
*** Spin tracking
12
*** Geometry update
13
*** G4BL update
14
*** PID VarB - tof + tracker
15
*** String/Json/Cpp conversion API
16
*** Memory leak fix
17 3 Rajaram, Durga
** Minor patch release = 0.8.5
18
*** Physics list bug fix
19
*** Ckov empty data bug fix
20 1 Rajaram, Durga
** Wish-list for next release:
21
*** EMR -- digitization,  reconstruction
22 3 Rajaram, Durga
*** Close Json/Cpp conversion #1376
23
**** Cpp Maps updated
24 1 Rajaram, Durga
*** Ckov geometry
25
** Targets for future release
26
*** KL Digitization tune
27
*** DAQ maps to DB #1375 (needs #994)
28
29
30
** Schedule(All): attachment:210514_Software_and_Computing.ods
31
32
** Detectors
33
*** Detector integration (Durga Rajaram)
34
*** Tracker (Adam Dobbs)
35
**** Station-numbering bug #1437 - fixed (?)
36
**** Add station-z to data structure #1438 
37
**** Nan bug #1454 - fixed in tracker devel(to be tested) -- close?
38
**** -Low pt tracking failures-
39
**** *ACTION*: flag low pt for downstream reconstruction
40
**** Space-point, track-finding efficiency studies partly blocked by lack of trigger #1182
41
**** *ACTION*: Ryan to have a face-to-face with Adam  and Heidt later in the month re geometry interface
42
*** TOF (Durga Rajaram)
43
**** TOF Calibration - integration with MAUS
44
*** EMR (Yordan Karadzhov/Francois Drielsma)
45
**** -Finalize geometry-
46
**** MC #1033
47
**** Track Reconstruction
48
**** *ACTION*: chase EMR group for code push, schedule update
49
***** Francois to push his code to lp
50
*** KL (Mariyan Bogomilov)
51
**** Validation/optimization #1411
52
**** *ACTION*: JN to make comparison plots available to help with tuning and optimization
53
*** RealData (Yordan Karadzhov)
54
**** DAQ channel maps to DB (Rajaram) #1375, blocked by #994
55
*** Ckov (Drews/Winter/Rajaram)
56
**** Finalize geometry
57
***** Cremaldi + student have shown me what they have, to push to lp 
58
*** Global Recon (Jan Greis/Celeste Pidcott)
59
*** PID (Pidcott)
60
**** -PID-VarB, DR to merge-
61
*** Monte Carlo trigger (Ryan Bayes) #1182
62
**** -fix tests, review, run, validate - affects tracker studies-
63
**** RB reported an issue resizing recon_events in datastructure, after setting #trig events, DR to look
64
**** restructure TOF digi?
65
** Infrastructure
66
*** Geometry/MC (Stefania Ricciardi/Ryan Bayes)
67
**** Ckov legacy cleanup (Cremaldi)
68
**** need positions of survey nests from detector groups
69
**** need input on diffuser thickness
70
**** Speed improvements (Bayes)
71
*** MC Beam
72
**** -G4Beamline documentation-
73
*** GRID and Batch Production (Chris Rogers/Janusz Martyniak)
74
**** -Memory leak: #1456-
75
*** Code deployment (All)
76
**** -Memory leaks in MAUS #1431-
77
*** Documentation
78
**** doxy doc has relative path issues -- should be fixed in upcoming release
79
*** Data Structure
80
**** Standardize conversion from string/json to cpp #1376 (Rogers)
81
***** API done
82
***** CR working on modifying mappers
83
***** Input and Reducer as well?
84
** Online
85
*** Online data quality (Chris Rogers)
86
**** Have prototype GUI and prototype ROOT-based document DB to replace maus-web-app and django #1312
87
*** Software On Call (Durga Rajaram)
88
**** June run
89
****  http://micewww.pp.rl.ac.uk/projects/maus/wiki/Software_on-call (SOC wiki)
90
* AOB
91
** Step IV Readiness
92
** *ACTION*: CR to make computing project spreadsheet available to link with rest of Step IV readiness schedule
93
* Date of next meeting June 4 2014
94
95
h2. International Toll-Free Dial-in numbers
96
97
* Switzerland:	0800705351
98
* UK:	08004960576
99
* US:	1-866-740-1260
100
* "Other numbers":http://www.readytalk.com/an.php?tfnum=8667401260
101
*Access Code: 5673390*
102
103
h2. Notes
104
105
h3. Attendance
106
107
Adam Dobbs
108
Chris Hunt
109
John Nugent
110
Stefania Ricciardi
111
Chris Rogers
112
Sophie Middleton
113
Chris Heidt
114
Email updates from: Ryan Bayes, Celeste Pidcott
115
116
h3. KL
117
118
h3. Ckov
119
120
*ACTION* DR get Lucien's geometry into MAUS
121
122
h3. EMR
123
124
Notes from CR,VB from the EMR paper discussion, the EMR group aims to have their
125
code pushed by the end of June. Schedule a review when code is ready to be looked at.
126
127
h3. Tracker
128
129
Calibration interface may move to, or need input from, David Adey
130
131
*ACTION*: Combine PR, Kalman integration test items into one in spreadsheet
132
*ACTION*: DR to look at integration tests, see if we need more
133
*ACTION*: AD circulate schedule to tracker group and get an update on Kalman
134
135
h3. TOF
136
137
h3. Global
138
139
CP working on pulling KL and Ckov into PID, requires modifying the datastructure
140
141
h3. MC
142
143
h4. G4BL
144
145
There is a request to have G4BL decks in the CDB
146
JN will handle the interface code, JN to see what's in the DB and decide if it needs a new table
147
148
h3. Build system
149
150
Some third party url's are going bad, and for fear of unmaintained servers, want to get MICE-owned third parties
151
into a common place
152
153
h3. Miscellaneous
154
155
Would like an SL6 box for testing, there are errors showing up on 64-bit SL6 that are masked on SL5.