Actions
2017-04-07-H2ProjMeeting¶
Agenda¶
Neon test¶
- Input from Steve Harrison
- Taper on drop plate output?
- Spacer, top hat, window. MLI mesh?
- Discussion
- Agree configuration for install.
Hydrogen¶
- Agree pipework routing internal to turret including pressure gauge connection.
- Safety configuration for Hazop.
- Absorber failure mode with pressure relief.
- Quench pipework
- 3 off 100mm lines external to hall.
- 1 for roughing pump
- 2 for quench line.
- 150mm line modifications
- Swept bends
- Line repositioned to align with wall ports – turbo on side arm with gate valve.
- Hydride bed?
Hazop¶
- Agree ‘leader’
- Panel members
- Documentation.
- Timing – 2 weeks?
H2 operators¶
- Documentation
Schedule¶
- Where can we apply additional effort?
- S Balashov (machining) – R Preece.
Updated by Whyte, Colin over 6 years ago · 2 revisions