2017-04-07-H2ProjMeeting

Agenda

Neon test

  • Input from Steve Harrison
  • Taper on drop plate output?
  • Spacer, top hat, window. MLI mesh?
  • Discussion
  • Agree configuration for install.

Hydrogen

  • Agree pipework routing internal to turret including pressure gauge connection.
  • Safety configuration for Hazop.
    • Absorber failure mode with pressure relief.
  • Quench pipework
    • 3 off 100mm lines external to hall.
  • 1 for roughing pump
  • 2 for quench line.
  • 150mm line modifications
    • Swept bends
    • Line repositioned to align with wall ports – turbo on side arm with gate valve.
  • Hydride bed?

Hazop

  • Agree ‘leader’
  • Panel members
  • Documentation.
  • Timing – 2 weeks?

H2 operators

  • Documentation

Schedule

  • Where can we apply additional effort?
  • S Balashov (machining) – R Preece.