MICE Project Board and Resource Loaded Schedule Review, March 2017

Back

Documentation

  • Responses to "homework questions":
    1. _Please give an example of a comparison between simulation and measured data through the beamline from the target to the EMR.

      What are the physicial quantities used in the comparison? (Phase-space plots and what else?)

      What are the parameters that are used in fitting the optics tuning data?  (For example initial particle distribution, magnet settings, absorber settings, et cetera?)

      How are the multiple Monte Carlo and other simulations integrated together? Why are the interface locations where they are?_

  1. What is the capability of U.S. members of the MICE collaboration to take part in the 2017/02 cycle (from September 19 to October 27) if such a data-taking run occurs? What would be the optimum (approximate) distribution between shifters and hardware experts?

Back

RLSR, MPB & FAC outline agendas – 07 & 08 March 2017

Venue: Conference Room 12/13, Building R68, RAL

Tuesday, 07 March 2017 and Wednesday, 08 March 2017

RLSR & MPB-11 outline agendas

07 March 2017
09:00-09:20 RLSR closed session – introduction
09:20-10:00 Project overview: 01-2017-03-07-Long.pptx K. Long 30' + 10'
10:00-10:15 Coffee 15'
10:15-12:15 RLSR presentations & questions
10:15-10:55 Project Manager's report: 02-2017-03-07-Whyte.pdf C. Whyte 30' + 10'
10:55-11:20 Status of the liquid-hydrogen project: 03-2017-03-07-Bayliss.pdf V. Bayliss 20' + 5'
11:20-11:55 Completion of the US construction project: 04-2017-03-07-Bross.pptx A. Bross 25' + 10'
11:55-12:15 MICE project in the US; completion of efforts: 05-2017-03-07-Palmer.pptx M. Palmer 15' + 5'
12:15-13:00 Lunch
13:00-13:30 RLSR closed session session--critical findings
13:30-15:00 MPB: Operations, software and computing
13:30-13:55 Commissioning and operation: 06-2017-03-07-Hodgson.pdf P. Hodgson 20' + 5'
13:55-14:20 Operation of the magnetic channel: 07-2017-03-07-Boehm.pdf J. Boehm 20' + 5'
14:20-14:40 Bulk production of Monte Carlo: 08-2017-03-07-Maletic_v2.pptx D. Maletic 15' + 5'
14:40-15:00 Software and computing overciew: 09-2017-03-07-Rajaram.pdf D. Rajaram 15' + 5'
15:00-15:15 Tea
13:30-15:00 MPB: MICE Muon Beam and MICE experiment
15:15-15:45 Tuning the MICE Muon Beam: 10-2017-03-07-Franchini.pdf P. Franchini 25' + 5'
15:45-16:15 Detector performance: 11-2017-03-07-Overton.pdf E. Overton 25' + 5'
16:45-17:30 Closed session, report writing
18:00 Adjourn
08 Mar 2017
09:00-10:00 Beam-based alignment, mutlple Coulomb scattering and energy loss
09:00-09:25 Beam-based alignment: 12-2017-03-08-Drielsma.pdf F. Drielsma 20' + 5'
09:25-09:55 Study of multiple Coulomb scattering and energy loss: 13-2017-03-08-Soler.pdf P. Soler 25' + 5'
09:55-10:25 Analysis overview and emittance evolution: 14-2017-03-08-Rogers.pdf C. Rogers 25' + 5'
10:25-10:45 Non-parametric phase-space density estimators: 15-2017-03-08-Mohayai.pdf T. Mohayai 15' + 5'
10:45-11:00 Tea
11:00-11:40 Moving forward
11:00-11:20 Completing the Step IV programme: 16-2017-03-08-Booth.pptx C. Booth 15' + 5'
11:20-11:40 Upgrading Step IV to deliver a cooling demonstration: 17-2017-03-08-Ronald.pdf K. Ronald 15' + 5'
11:40-13:30 Closed session, lunch and report writing
13:30-14:00 Close-out with MICE management
14:00 Adjourn for report writing

MICE contributions to the FAC

08 March 2016
14:30-- MICE Funding Agency Committee
Progress since the last FAC meeting Key Issues and Concerns: 01-2017-03-08-Long.pptx K. Long 20'
Project Manager's Report: 02-2017-03-08-Whyte.pdf C. Whyte 20'
Common Fund: 03-2017-03-08-Soler.pdf P. Soler 20'