Project

General

Profile

Actions

2016-10-25-MIPO

Agenda

  • Actions
  • Magnets
    • Mechanical
      • Restraint/bellows 'bridge'
      • Absorber change/position - slight bellows extension.
    • Spectrometer solenoids
      • Status update - AB
      • Electrical feedthrough 'air/heat provision'
    • Focus coil - JB/JC
    • Magnet shifter
  • Hall Water - CW
  • H2 system. - VB
  • Shutdown task list.
    • Magnet location.
    • Hall water.
  • November ISIS run period
    • Magnet settings
    • Data-taking
  • AOB

Documents

Phone Details

UK - 0844 473 7373
US - 1 415 363 0833
PIN 801140

Updated by Whyte, Colin almost 7 years ago ยท 2 revisions