2016-07-25-MagnetMeeting » History » Version 1

Whyte, Colin, 24 July 2016 20:41

1 1 Whyte, Colin
h1. 2016-07-25-MagnetMeeting
2
3
h2. RAL R1 15.00UK, 09.00Chicago
4
5
Phone : Readytalk- http://mice.iit.edu/phonebridge.html 
6
7
h2. Agenda
8
9
* Introduction: 
10
* Notes of last meeting and actions:
11
** All outstanding actions (SF) parked until end of month.
12
* Update on last day's running on Wed 20th July 2016 - CMcW.
13
14
h2. Analysis group input
15
16
** How much data/time do the analysis people want?
17
http://micewww.pp.rl.ac.uk/projects/operations/wiki/20160720_settings_
18
** Does 140A SSs and ~60A FC provide meaningful data?
19
** Is current 'twiddling' required?
20
21
22
h2. Technical discussion
23
24
** FC - SS forces (single SS)?
25
***  measurable? _ Actions to fix?
26
** FC thermal performance
27
*** What should current steps be?
28
*** How long at each current setting? ( 1 hour?)
29
* Ramp rates & quenches:
30
** Will an SS quench cause the FC to quench? (Yes, demonstrated )
31
** Will an FC quench cause the SS's to quench? (Probably)
32
** Will fast rundown of an SS cause the FC to quench (No)
33
** What FC ramp rate will trip the SS QP system? (Probably > 25 mA/sec
34
but requires study/measurement.)
35
** Does 'canonical' 25mA/sec ramp of SSs cause FC QP to trip (No)
36
37
* Status of fast FC data logger
38
39
* 'Standoffs' between SSx and PRY end plates - PRY/Magnet movement - CW/JT
40
41
42
h2. Discussion of next steps
43
44
Plan for Monday 18th July
45
46
* DONM
47
* AoB