Actions
2015-04-28-MIPO¶
Agenda :-¶
- Actions and MEMO report
- 15-04-14 Minutes MeetingMinutes-150414.pdf
- Bellows discussion for field measurements
- Lock out bolts to react load
- Design changes to future bellows purchase?
- North PRY
- Transportation plans to RAL
- Lifting and handling
- Cooling demo PRY design
- Requirements and critical dates
- Current design
- LiH Absorber quotation update
- AOB
Supporting Documents :-¶
Layout of the PRY for the Cooling Demo for discussion from Steve Plate - Step_V_Prime_Layout.pptx
Layout of the waveguides above the Cooling Channel - RF_Waveguides_1.jpg
Bellows assembly drawing - 26L201A.pdf
Bellows flange drawing - 26L200A.pdf
Bellows specification document - Bellows_Specification_draft_1.doc
Phone Details :-¶
UK - 0844 473 7373
US – 1 415 363 0833
PIN - 801140
Updated by Hanlet, Pierrick about 8 years ago · 12 revisions