Agenda :-

  1. Actions and MEMO report
  2. 15-04-14 Minutes MeetingMinutes-150414.pdf
  3. Bellows discussion for field measurements
    1. Lock out bolts to react load
    2. Design changes to future bellows purchase?
  4. North PRY
    1. Transportation plans to RAL
    2. Lifting and handling
  5. Cooling demo PRY design
    1. Requirements and critical dates
    2. Current design
  6. LiH Absorber quotation update
  7. AOB

Supporting Documents :-

Layout of the PRY for the Cooling Demo for discussion from Steve Plate - Step_V_Prime_Layout.pptx
Layout of the waveguides above the Cooling Channel - RF_Waveguides_1.jpg
Bellows assembly drawing - 26L201A.pdf
Bellows flange drawing - 26L200A.pdf
Bellows specification document - Bellows_Specification_draft_1.doc